Laserfiche WebLink
IA HPEE CONSERVATION COMMISSI N <br /> Minutes of 19 October 2000 <br /> Commissioners present•, John Fitzsimmons, Elliot Rosenberg, John Johansen, Ralph Shaw. <br /> 6:45 REGULATIONS HEARING: To change Regulation 33, Requirements regarding Lands <br /> within 200 feet of Rivers and Streams, Section (F) to read: <br /> 1. For jurisdiction under chapter 172, the provisions of 310 CMR 10.58 (6), a, b, d, e, f, g' ' <br /> and h do not apply; these activities are not grandfathered or exempted. <br /> 2. Notwithstanding the provisions of 31 o CMR 10.58 (4) {d} 4, a minimum 100 foot wide <br /> Inner riparian area of undisturbed vegetation must be provided for structures and/ <br /> or alterations for any commercial purpose or use. <br /> VOTE: Motion made and se onded to implement the changes to the Regulation 33, a <br /> read. Unanimous Vote. <br /> 6:55 PUBLIC COMMENT-. none. <br /> 7:00 MMR - COMMUNITY INV LVE 11ENT UPDATE: Mile Minior displayed an aerial photo <br /> of the sampling wells. flaps were distributed. He referred to page two for the <br /> monitoring wells and advised there is sfill EDB in the 132 well location. This is being <br /> addressed. The last page is a summary. So far they have treated one-half billion gallons <br /> of water. They estimate there is 20 lbs. of EDB in the plume and so for they have taken <br /> out over 6 pounds of that. The estimated span of the clean-up is seven years. <br /> To a question of when.funds would be received, Mr. Minior stated that will be done by <br /> electronic transfer, no later than.l November 8. <br /> Mr. Rosenberg asked if work can be done at that point and would that inhibit activities? <br /> Mr. Sherman it is difficult to have Ms Fantoz i start viithout a deposit to pay her bills. Mr. <br /> Minior asked if, knowing the money is coming,.perhaps a reimbursement account could <br /> be set up n ? Town Accountant to be contacted for feasibility of that suggestion. <br /> Mr. Minior advised they worked with Steve Hurley this week relocating some fish. They will <br /> be shutting down K2 ditch in the future. A plan will go through con erVation for approval. <br /> They aro trying to keep the fish in the main channel. <br /> Mr. Sherman stated a contemporary survey on the berm they had problems with is <br /> needed, lease lino data. <br /> Ms Boretos asked what happened in August and September and the caveat of the data <br /> unvalidated. Mr. Minior stated they run the analysis and these are the numbers that <br /> come lack, then they run it through a duality control process and the laboratory signs <br /> off that everything was appropriate that day and all the canalses. ere valid. That tales <br /> upwards of a month after the analysis is clone. <br /> i <br /> In the deep well, some of the EDB is upwelling in the K6 area. That will all be addressed in <br /> the final remedy. Ms Boretos was invited to a meeting on the Base on 1 November er re <br />