that no work will result from this AN AD. Father it is merely to ascertain the limits of
<br /> jurisdictional resource areas under the Act and By-Law so that the planning can be.done.
<br /> This matter could not be approved at this meeting, but Bob said we need to go on record
<br /> regarding what we will require. 1 the ACS scale is too larger 2 the plans must be stamped, 3
<br /> the reap and block rust be shown on individual plans, the puns must have a legend,
<br /> 5) we have to be sure the flagging on the plan is fresh, so it has to be refiagged, some
<br /> reference points should be added to the plans where there are no discernable landmarks,
<br /> 7) some things don't add up, i.e., ET4 shows a straight line going for 150 ft. or more, yet the
<br /> contour for the typography is curved, the numeration is erratic, i.e., sometimes arabic
<br /> numbers, sometimes decimals, sometimes flag numbers, sometimes numbers are skipped, 9)
<br /> on ET , the flagging should continue at least 100 ft. off the edge of the parcel.
<br /> In addition, Bob said this project is so vast that it would tax the department in teras of time and
<br /> capacity. We are barely able to keep up with the normal hearings, so he and his staff can't take
<br /> a whole week to do delineation work on one project. Therefore, we may have to invoke our
<br /> capacity to bring in an outside firm. Bob suggested that he and Michael take a half day to look
<br /> at some of these areas to know what needs to be shown on the plans.
<br /> Motion made, seconded and unanimously carried to grant a continuance to April 29 at
<br /> 7:00 p.m., at the request of the applicant.
<br /> 7:05 p.m., Bayswater Development,pr ent, LLC# 73 Seanest give construct single family house,
<br /> driveway, patio and yard). Carl Smith, Earth Tech, represented the applicant. Bob said that we
<br /> can not hear this application because of litigation with the Cape Cod Commission as to whether
<br /> or not this is a CTI, and we have been advised by Town Counsel to stick to that.
<br /> Motion made, seconded and unanimously carried to grant a continuance to April 29 at
<br /> 7:05 p.m., at the request of the applicant.
<br /> 7:10 p.m., Charles Nirenberg, 28 Triton Way (beach nourishment and maintenance of an
<br /> existing stone revetment). Cass reclued herself from this hearing. Sara 'Agostino, coastal
<br /> geologist, represented the applicant and presented the pian. Bob recommended approval.
<br /> Motion made, seconded and unanimously carried to approve the plan.
<br /> . rnf, Dan Baker, 2 Sunset circle (replace grass with stones, walkways, drywell,
<br /> plantings). Patrick Ball represented the applicant. Bob recommended approval.
<br /> Motion made, seconded and unanimously carried to approve the plan.
<br /> i
<br /> 7:20 p.m., Howard Glaser, 397 Great Oak Road (continued from 3/18/04). Cass r clused
<br /> herself from this hearing. John Slavinsky represented the applicant and presented the plan.
<br /> Bob said 1 the plan does not shown the work limit numbered and lettered by stations, 2 on the
<br /> earlier plan, the BV line disappeared, now it's returned, but he thinks its not as high as now
<br /> shown, and 3 the earlier plan showed contours, and the new one doesn't but should.
<br /> Motion made, seconded and unanimously carried to grant a continuance to April 15 at
<br /> 7:35 p.m., at the request of the applicant.