Laserfiche WebLink
Motion made seconded and unanimous) carried to grant a contmnuanee to March 17' at 7:00 <br /> p.m., at the request of the applicant. <br /> 7:45 p.m., Cape Southport Associates,ILC, 3 Southport Drive (continued from 2/3/05). <br /> Lloyd reelused himself from this hearing. John Bresnehan represented the applicant and <br /> described the new plan, which clarifies that the delineation of the coastal lank is only good for <br /> this application. Bob said that for any future work, not only vel the delineation of the banks be <br /> subject to the new relations, but the interpretation of the banks as well. Mr. Bresnehan added <br /> that there will he no disturbance to the vegetation outside the work limit on the slope of the <br /> inland bank at any time, and he also listed the proposed planti <br />