My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/21/2005 CONSERVATION COMMISSION Minutes
>
4/21/2005 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2018 2:55:29 PM
Creation date
3/2/2018 2:54:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
04/21/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7:25 p.m.,Lawrence Herman, 43 Uncatena Road (add entryway, porch and bulkhead). <br /> Motion made, seconded and unanimously carried to approve a continuance to May 19th at 7:00 <br /> p.m., at the request of the applicant. <br /> 7:30 p.m.,Judy Crossen, 181 Surf Drive(construct proposed house, porch, garage, deck, Title <br /> V septic and utilities). <br /> Motion made, seconded and unanimously carried to approve a continuance to May 5th at 7:15 <br /> p.m., at the request of the applicant. <br /> 7:35 p.m., Michael Intoccia, 134 Popponesset Island Road (replace grass lawn with new <br /> seed/loam). John Slavinsky represented the applicant. Steve recommended approval. <br /> Motion made, seconded and unanimously carried to approve the project. <br /> 7:40 p.m., Gregory Hunt, 15 Harbor Ridge(addition, deck extension, roofed deck connection). <br /> Dave Slavinsky represented the applicant. Steve described the project and recommended <br /> approval. <br /> Motion made, seconded and unanimously carried to approve the project. <br /> 7:45 p.m., Lisa Drake,413 and 417 Monomoscoy Road(continued from 4/7/05). Pete Sullivan <br /> represented the applicant. Steve described the project, said the mitigation plan and septic system <br /> meet our standards, and he recommended approval. Jack said with the proposed expansion, they <br /> are now encroaching into the buffer zone. Mike said he would like to see all the landscaping and <br /> deck pushed back from the buffer, which will allow for potential revegetation of that buffer zone. <br /> After considerable discussion, it was decided that an extensive mitigation plan would be a <br /> favorable tradeoff for any intrusion of the construction into the buffer zone. <br /> Motion made, seconded and unanimously carried to approve a continuance to May 5th at 7:35 <br /> p.m., at the request of the applicant. <br /> 7:50 p.m.,Edwin Sidman,4 Mute Swan Circle(continued from 4/7/05). John O'Day, Sullivan <br /> Engineering, and David Hawk represented the applicant. There was considerable discussion <br /> regarding the failure of the plan in meeting our guidelines, so Messrs. O'Day and Hawk will <br /> consult with their client to revise the plan. <br /> Motion made, seconded and unanimously carried to approve a continuance to May 19th at 7:10 <br /> p.m., at the request of the applicant. <br /> 7:55 p.m.,Willowbend Country Club, 95 The Heights (continued from 4/7/05). <br /> Motion made, seconded and unanimously carried to approve a continuance to May 5th at 7:40 <br /> p.m., at the request of the applicant. <br /> 3 <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.