Laserfiche WebLink
condition. So the floats are the only rernaini g iMr.r. Jones said the structures were in <br /> p <br /> .lace by the earl '80s, and theapplicant's position is that they are grandfathered. Bob said the <br /> floats on the original plan were 8x16 sq. ft. and received a Chapter 91 license. Since thea they <br /> have been considerably enlarged in the last several years, so his opiuion is that they are not <br /> grandfathered, and since they were enlarged,_they do not correspond to a Chapter 91 license. <br /> Therefore, he would recommend to the Commission that the floats have to be reconfigured t <br /> 150 sq. ft. as a mit. N'o there are three floats 6 1 q. fl., so they are o fl. over. Michael said <br /> his concern is that the float is 6 f . vide, and our standard is 4 ft. wide. Mr. Jones said the <br /> enlargement was done prior to the applicant's ownership. <br /> Bob sm'd he respectfully disagreed, as he discussed this with Stan Humphries and the <br /> Harbormaster is ready to sign an affidavit that this was done prior to Mr. Coleman owning the <br /> property. In his opinion, the floats are a relevant issue <br /> Michael said if we set a precedent for approving something that does not conform to our existing <br /> standards a plan ti mitigationis ire order. Bob said they could make it longer if it doesn't have a <br /> Chapter 91 problem. They could have built a longer dock if they had applied to us prier to <br /> build g it, and we would not have permitted anything bigger than the standard 150 sq. f . <br /> Bob asked if 1 4r. Jones' client would be wiffing to reduce the floats to 150 sq. ft. and submit a <br /> mitigating vegetation plan to create a buffer zone in the area. Mr. Jones wiR tale this back to his <br /> cheat. <br /> Bob will figure the rmtigati n calculations to determine the mitigation required. <br /> Motion made, seconded and unanimously carried to grant a continuance to August 11th at :20 <br /> p.m., at the request of the applicant. Bryan Jones represented the applicant. <br /> 8:15 P.m., ortolottl Construction, 35 Wilson's Grove(continued from 6/30/05). <br /> Motion made seconded and unanimously car'e'd to grant a continuance to July 280 at 7:15 p.m., <br /> at the request of the applicant. <br /> Meeting adjourned at 8:32 p.m. <br /> Respectfully submitted, <br /> 9/% Ann C"n �- <br /> Frances wise; Board Secretary <br /> 5 <br />