Laserfiche WebLink
I ' <br /> i <br /> Steve said the construction details for the stairs down to the dock scare him it's going t <br /> require some very precision work. No cuttings should be done on the bank, and all the cuttings <br /> should be done inside the work limit. These are.the conditions he puts into an order, but lately <br /> e goes to sites and sees mayhem. Michael said there .re cease and desist orders that will get <br /> people's attention. <br /> In summary, the walk vill be done fiat and coincide with the demolition, there will be no <br /> sediment grading construction work until the wall is done, and the work limit is to be placed at <br /> the top of the wall. <br /> Motion made, seconded and unanimously carried to approve this NI pending receipt of a <br /> revised plan showing a detailed construction protocol requiring the construction of the wall first <br /> and can coincide with the demolition, and the work lint will be at the top of the wall for the <br /> construction of the Douse. <br /> 7:40 p.m. Dennis Kerkado, 184 Captains Row(expand dri <br />