My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/25/2006 CONSERVATION COMMISSION Minutes
>
5/25/2006 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 5:23:20 PM
Creation date
3/5/2018 10:43:42 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
05/25/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,49 <br /> concerned about this project. He suggested that the notion be to deny this application since the <br /> whole project has changed. If the Board does not grant that, he suggested that a proviso be put <br /> on any future plans on this property to give notice to the neighbors. Steve said in any case, they <br /> wiU have to refile, and the neighbors will receive notice. <br /> Motion made, seconded and unanimously wed to approve the withdrawal of this application. <br /> 7:10 P.m. Leonard Florence, 78 Triton way(install fiber rolls). Sarah 'A.go tino represented <br /> the applicant and described the plan. Steve said last October the revetment was almost an <br /> emergency situation, and they had to out through a considerable swath to get down to the <br /> revetment, but they had to do it or lose the revetment. He doesn't think revegetation of the swath <br /> is a good idea now because to do so would result in their removing vegetation again. He thinks <br /> that letting this area go natural without plantings in the swath that was out with the machineiy is <br /> one thing. However, vegetating the bank to ensure the integrity at the top of the bank is crucial. <br /> The original order was to plant such grass, which didn't take. Now to protect the integrity of <br /> the bark they are proposing to put fiber roils in place. Ms. L 'Agostino said they wig be laid to <br /> fit the contour of the existing bank, they'll put some fill on top and vegetate it. Michael said he <br /> would life to see a cross section showing hove the fiber rolls will be installed showing staking <br /> techniques, what will be used to prevent erosion on the slopes between the fiber rolls, and what <br /> materials will be used to fill. <br /> Jack asked about the lifetime of this project. Ms. ]'Agostino said the contractor said something <br /> like five years. Steve said they are looking for vegetation that would establish the quickest <br /> before a hurricane. Xichael said beach grass would establish the quickest, and the plus should <br /> be planted in containers very tight " on center). If they plant one-gallon shrubs, they should be <br /> no more than 18" on center. Steve said in view of the urgency of the situation, he recommended <br /> approval of the project contingent on receipt of a work'plan that is acceptable. <br /> Motion made, seconded and unani <br />
The URL can be used to link to this page
Your browser does not support the video tag.