Laserfiche WebLink
r <br /> commissioner Fitzsimmons read a statement from the Board of Health;the Board of Health listed the <br /> application as incomplete with insufficient information. Michael LeBlanc stood to represent the applicant. <br /> Mr. LeBlanc explained that the project is to create a theatre room,gym and bathroom in the basement of <br /> the home as well as add egress windows. The Commission questioned whether the application would b <br /> heard with the open.issue with Board of Health. The Agent explained that the application can be-head <br /> and that the Board of Health needs a copy of the plan and some clarification only. The Agent explained <br /> that the Board.of Health just wants to make sure there is not bedroom put in. The Agent explained that <br /> there are protocols in place to ensure that the area is in compliance and that the permit can be meld until it <br /> can be verified. IIIb. LeBland explained that the project will entail adding some stairs to be able to mess <br /> the basement as well as the installation of a storage shed. The Agent explained that the area is entirely <br /> disturbed, and he recommended a negative determination. <br /> Motion made,seconded and carried to negative Determination contingent upon Board of Health <br /> approval. 4. <br /> 7:08 p.m.John Roche,AOC—94 Bluff Avenue <br /> (Revise landscape plan) <br /> Mr. Roche stood to represent himself. IIIb. Noche explained that he would like to punt some small <br /> plantings behind the house, reinstall grass around the house as well as expand his patio With blue stone <br /> laid over sand. Mr. Noche explained that he would also like to add a 10 x 12 shed on the property and <br /> that he wound like to make the driveway crushed shells. The Agent explained that the area is entirely <br /> landscaped. The Agent asked that the grass be conservation mix, something that does not require any <br /> type of fertilization.The Agent also suggested that Mr. Roche add some snail plantings in front of the <br /> grass to stabilize it. Commissioner Fitzsimmons mons questioned the side setbacks and where the shed was <br /> placed. Commissioner Fitzsimmons and the Agent suggested that Mr. Roche check with the Building <br /> Department to make sure he is in compliance with their requirements as well. <br /> Motion made, seconded and unanimously approved to Approve the Amended order pending <br /> verification with the Building Department. <br /> 7:09 p.m.Stephen and Mary Lernpitskl, N01—102 captains Row <br /> (construct, license and maintain in perpetuity a pier, ramp and float) <br /> It was read for the record that the applicants requested a two-week continuance until 1011512008 @ 7:46 <br /> p.m. Commissioner ioner F Simmons and the Agent read that there have been no comments back from <br /> Natural Heritage yet on the project. <br /> Motion made,,seconded and unanimously carried for a continuance until 1011812008 @ 7:46 p.m. <br /> 7:12 p.m.eonnelius and Maureen Ferris, NON—38 seconsett Point Fuad <br /> (Demolish and rebuild a new single family hone and foundation, upgrade utilities, plant disturbed <br /> areas and perform mitigation plantings with associated appurtenanc s)(continued from <br /> 09/1812008) <br /> A representative stood to represent the applicants.The representative explained that the project will <br /> remain a three bedroom but will require a septic upgrade. The representative explained that the house <br /> will be rebuilt lamer to the front and side.The representative explained that the project includes dry wells, <br /> septic upgrade and driveway improvements.The Agent explained that the application is missing a <br /> construction methodology as well as a narrative on the resource areas and their performance/effect on <br /> these areas. The Agent also requested a more detailed mitigation plan.The Commission questioned <br /> whether the ramp, platform were licensed under Chapter 91. The representative explained that he did not <br /> believe they were but could do some research to ascertain it.The Commission stated that they felt <br /> continuance was in order. The representative agreed to a two-week continuance until 10/1612008 @ 7:51 <br /> p.m. <br /> Motion made, seconded and unanimously carried for a continuance until 1011812008 @ 7:51 p.m. <br /> 7:15 p.m- Paul and Jennifer valentine, RDA�Wa eby Pond <br /> (continued from 99118198)(Replace existing seasonal dock structure) <br /> A representative stood to represent the applicants. The representative explained that the homeowner <br /> are looking to demo and rebuild an existing dock.The representative explained that the dock will b <br /> 2 <br />