My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/9/2012 CONSERVATION COMMISSION Minutes
>
2/9/2012 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 5:15:41 PM
Creation date
3/5/2018 1:10:34 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
02/09/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• awl qJ"Mashpo' e , <br /> -ea <br /> .16 Gi Ck <br /> Conservation Commission <br /> Thursday, February 9, 2012 <br /> Conference Room 2— I lashpee Town Hall <br /> Call Meeting To Order: 6:55 pry - Public Comment <br /> PRE/POST-HEARING AGENDA: <br /> 0 Minute Approval of the f oll wi ng minutes: January 12 2912 & January 26, 2012 <br /> 0 Sol r ee project: DEP recommended ICDA filing <br /> 0 Land Stewardship meeting recap <br /> HEARINGS <br /> 7:00 Mark Caliri Edgewater Drive) 18' x 21' wooden ptatf rm and proposed NOI <br /> vegetation plantings <br /> 7:03 Devin Mulgrew 33 Sunset Circle) Construct wood retaining wall, fieldstone N I <br /> retaining wall and replace turf & patio area with sand and compensatory plantings <br /> Continued from January 26, 2012 * <br /> 7:06 Lernonia Macro p ul s Cayuga Avenue) Remove five trees that are close to RDA <br /> home that is damaging the deck and roof and are also potentially <br /> hazardous to the dwelling <br /> 7:09 Matt DeSutter (26 Water a Demolish and rebuild a single family home with N I <br /> driveway, pool and all appurtenant utilities <br /> 7:12 Rosemary & James Mitchell 99 Popponesset Island Road) Construct and N I <br /> maintain in perpetuity a licensed wooden pier ramp and float <br /> 7:15 Stephen Sullivan Sextant Circle) Install a -bedroom soil absorption system RDA <br /> to meet Title 5 requirements. The existing 1000 gallon leaching pit will- be <br /> pumped dry, disconnected and filled with clean fill <br /> 7:18 John Donnellan 9 Pond Circle Construct a 23'5" x 25" two car attached RDA <br /> garage with maintenance in perpetuity <br /> 7:21 Gloria Henn 29 See n ett Point Road Pump existing cesspool, fill with clean FDA <br /> sand and abandon: A complete Title 5 septic system and associated piping <br /> will be installed <br /> i 7:24 David S arpitti/ Mass. Division of Fisheries and Wildlife (Great Hay lead Holland RDA <br /> Dills Road) Propose habitat management treatment activities which will include <br /> mowing and mulching of smaller trees and shrubs. Additional efforts may include <br /> prescribed burning and invasive plant species treatment at some point in the <br /> future. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.