My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/9/2012 CONSERVATION COMMISSION Minutes
>
2/9/2012 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 5:15:41 PM
Creation date
3/5/2018 1:10:34 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
02/09/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7:12 Rosemary & James Mitchell **43-2690** Popponesset Island Road) Construct and <br /> maintain in perpetuity a licensed wooden pier ramp and float.- NI <br /> Resource Area: LSCS , Salt Marsh, BVI, Lard Under Ocean <br /> Material submitted: Plan Accompany Petition of Mitchell Nominee Trust 419104-Cape & Islands <br /> Engineering Profile of Pr9posed Pier, Ramp.& Float 2 419104 Cape & Islands Engineering <br /> (36.491 John slavinski from cape & Islands Engineering explains that there is a Chapter 91 state <br /> license, Arany Corp engineer permit and a previously issued order of conditions from Mashpee. The <br /> state license and COE is still active but the order of conditions has since expired and .the dock has <br /> -not been built}ret. Agent McManus reads the comments from the shellfish Constable and the <br /> Harbormaster for the record. The Harbormaster now requires a street address be planed on all <br /> sections of the dock and float with the DEP number s well. Agent McManus states that he would <br /> like to see information regarding the storing of the float ramp during off season in the narrative. <br /> Motion'made, seconded and unanimously carried to close and Issue pending notification of <br /> off season storage <br /> 7:15 Stephen Sullivan Sextant Circle) Install a 3-bedroom soil absorption system to meet <br /> Title 5 requirements. The existing 1000 gallon leaching pit will be pumped dry, <br /> disconnected and filled with clean fill- RDA <br /> Resource Area: Buffer Zone to Coastal Ba kl Freshwater Wet and BVW <br /> Material submitted: Sewage Disposal system repair Design 1120112 Chris Costa &Associates <br /> [41-46] Klatt costar from Chris Costa & Associates is proposing to install a Title V septic system <br /> because the existing leach field failed. The closest point is 9' to the top of the coastal bank. Agent. <br /> McManus reads the Board of Health comments for the record and also states that all the work <br /> proposed is within previously disturbed areas. <br /> Motion made, seconded arra unanimously carried for a Negative Determination <br /> 7:18 John Donnellan Pond Circle) Construct a 23.5' x 25' two car attached garage # RDA <br /> Resource Area: <br /> Material submitted: Certified Piot Plan 1119112 Chris Costa &Associates <br /> ( 5,-2 Blatt Costa from Chris Costa & Associates explains that all construction proposed for a 23.5' <br /> x , ' two-car garage is in a previous disturbed area. The closest point of the' work area is 62' from <br /> the top of the inland bank. All run off will be collected by gutters and down-spouts. Agent McManus <br /> states that they will be replanting some areas with native plantings. He reads the Board of Health <br /> comments for the record which states that a review is not necessary as there is only storage above <br /> garage being proposed no additional living space). The Agent confirms this as a condition of the <br /> permit and states that there Will be a requirement to have a final inspection. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> 7:21 Gloria Henn Seconsett Point'Road) Pump existing cesspool, fill with clean sand and <br /> abandon. A complete Title 5 septic system and associated piping will be installed <br /> ICDA <br /> Resource Area. LSCSF, Buffer Zone to Coastal Bark <br /> Material submitted: Proposed Septic system Upgrade 1126/12 Engineering Works <br /> [50:46] Pete McEntee from Engineering Works is proposing a voluntary soil absorption septic <br /> system-upgrade. The system will be placed outside the '100' buffer zone but is within the flood <br /> zone. The tank will be instailed approximately 88' from the beach and 3'from the top of the <br /> coastal bank. Agent McManus reads the Board of Health comments for the record. <br /> Motion made, seconded arra unanimouslycarried for a Negative Determination <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.