Laserfiche WebLink
Material submitted: Flan Accompanying Petition X120195 Stephen Doyle &Associates <br /> [21:281 Mark Burtis from little Diver Dock.0 mparny is representing Mr. & Mrs. Felly and he <br /> explains that it is an older dock in,which the piles are rotting and need to be replaced. Mr. Burti <br /> states that his intention is to put the same,size diameter pile in the same hole. They will utilize most <br /> f the original frame. Mr. Burtis says that they will also elevate'the walkway to allow public passage <br /> underneath. Agent McManus reads the Harbormaster's arster's rr ment which requires property address <br /> identification on all sections of the pier and float. <br /> Motion rade, seconded and unanimously carried for a Negative Determination <br /> 7:12 William & Ruby Mills Great Neck Road North) Upgrade existing septic systern to Title V. <br /> Pump fill and abandon existing cesspool RDA <br /> - <br /> esre,area: Buffer Zone to River Front (Mashpee River) <br /> Material s bm e : Plan by GEHRS for Emergency Title V 315112 GEHRS <br /> [24,471 William Mills states that their existing septic system went into failure so they had contacted <br /> the .Board of Health who assisted them with designing a new system. Agent McManus states that <br /> this was ars emergency repair that was carried out. It falls within the 200' set back of the Mashpee <br /> River. The plan was created by the Health Agent and the upgrade has already been completed. <br /> The Agent's only recommendation is some e sort of ground cover to address exposed soils. Mr. Mills <br /> asks for a couple of weeks for the temperatures to become warmer and he will.comply.{ <br /> Motion ,Wade, seconded and unanimously carried for a Negative.Determination <br /> 7:15 William & Rebecca Power Dears Hollow) Upgrade existing septic system to Title V. Pump <br /> 5 <br /> and remove existing cesspool - RDA "Conlinued to April 2$ 2012 g, 7..00* <br /> Resource Area. LSCSF <br /> Material submitted <br /> (29:56] The applicant requested a continuance to April 12, 2012. <br /> Motion made, seconded and unanimously carried to continue to April 12, 2012 at 7:00pm <br /> 7:18 Ke Foster 17C Trinity Place) lns#all an L.P. Gas (propane) refill station Frith '1000 gallon <br /> capacity RDA <br /> - <br /> Resore Area: Beer Zone to Inland Bari <br /> Material submitted: Proposed Site Plan 311112 Sweetser Engineering <br /> 130.56] Ken Foster and Devin Filone are representing for the project. Mr. Foster explains than they <br /> are proposing ars installation of a 10gallon tank which will hold approximately 800 gallons of fuel <br /> and will be used to refill propane tans and cylinders primarily for BBQ grills. Currently, they are <br /> using an exchange program-which requires delivery from South Dennis via truck. This incurs a lot <br /> of traveling and is not the 11greene t,a of ways. The tank is beiwas <br /> placed n a platform that a <br /> initially intended for 6 trash- ompatordumpter but was never used for that purpose. The ped will <br /> support Y4of the tank and the back will need to be supported Frith a couple-of sonotubes. They will <br /> supply electrical power from the ,main.building. Mr. Foster explains that they will be placing cement <br /> berms in front to prevent anyone from driving into the tank which is ar Fire Department regulation <br /> and they will place a locked fence surrounding the area. The entire area will be well lit at night. Mr. <br /> Steve Cook asks what the'weight of the tank is and Mr. Foster says approximately 6,000lbs. Mr. <br /> Cook asks if the sonotubes will be able to support it and Mr. Foster explains that the sonotubes are <br /> mainly for the balance. Most of the tank will be supported by the platform. Commissioner Jalowy <br /> asks why not increase the pad size instead of using sonotubes and Mr. Foster answers that they <br /> could have but.he felt it would be less disturbance with the sonotubes. <br /> Lotion ,made, seconded and unanimously carried for a Negative Determination <br /> 3 <br />