My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/12/2012 CONSERVATION COMMISSION Minutes
>
7/12/2012 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 5:26:58 PM
Creation date
3/5/2018 1:14:04 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
07/12/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
that the existing dock will need the property address displayed on all sections of the dock including the <br /> float and fixed pier so that it is visible from the water. The DEP #for the dock should also be included <br /> with the address. Mr. Gurnee asks If there is any"tie-in" for the mitigation with the adjacent property. Mr. <br /> Vaccaro says that there is actually and he is the one that prepared the mitigation for the adjacent <br /> property. . <br /> Lotion made, se tided and unanimously carried to Close and issue pending Board of Health <br /> 7:09 Peter Dob ns & Tanya Davos Bakers Road)'M odifi cati ons to a single family-d gelling including <br /> r ryew Title-5 septic system. Existing cesspool will be pumped dry, filled with sand and <br /> abandoned - lol <br /> Resource Area: Inland Bank Leading to Mashpee Pond <br /> Material submitted: Plot Pian 6110112 Falmouth Engineering 1 Septic System Details 6110112 Falmouth <br /> Engineering <br /> [1:07:40) Jack Vaccaro is presenting on behalf of Mike B r ells from Falmouth Engineering and explains <br /> that they are proposing renovations to the structure that is closest to the Ma hpee- v keby Pond. They <br /> could like to add a second floor to the home. There will also be-renovations to the first floor, re-siding <br /> and new windows. The only other work involves the replacement of the current cesspool that is situated <br /> very close to the lake: Mr. Vaccaro states that they would pump that dry, fill with sand and abandon it in <br /> place and replace it with a'new Title V septic system. It is a standard system but with a pump because <br /> the new soil absorption system is being sited further back on the property which is an uphill ulimb,so the <br /> new tank being installed will have an internal pump. Mr. !Vaccaro explains that there are outstanding <br /> issues being worked on with the Board of Health with the fact that they are increasing the number of <br /> bedrooms. The Health Agent has indicated that an alternative innovative treatment or denitrification may <br /> be required. Mr. Borselli is Meeting with the Health Agent and it may be needed that a revision showing <br /> a denite might be required. Agent McManus states that the issue with the Board of Health is a <br /> component of the system that is outside Conservation jurisdiction. Agent McManus advises Mr. Vaccaro <br /> that even though it is outside of this project, it is now required that the hone address and permit number <br /> be displayed on all sections of the existing dock. Vice Chairman ShaW asks if there would be any.effect <br /> to the tank and pump chamber if there are any changes issued by the Board of Health. Mr. Vaccaro <br /> 'confirms than there-could be some changes to the internal mechanisms but the location of the tank will <br /> remain the sane. Mr. !Vaccaro states that if there are any changes that are within Conscom jurisdiction <br /> than a revised plan will be submitted. Mr. Gurnee suggests paying careful attention to the work limit and <br /> hay bales as the bank is real steep and erosion could still get through. <br /> Motion crude, seconded and unanimously carried to Close and Issue <br /> 7:12 David & Deborah Fischer (178 Wheeler Road) Replace and reburiId 10' x 32' deck in the same <br /> footprint --RDA <br /> Resource Area: inland Bank Leading to Ashumet Pond <br /> Gael submitted. Plot Pian 712112 Paul Sparks Remodeling <br /> [1.15.3 Paul arks from Paul arks Remodel is representing for Mr. Mrs. Fischer and he <br /> p p p g _ <br /> explains that they are proposing to remove and replace the su' ndeck In the same footprint. Agent <br /> McManus states that it is all pre-disturbed maintained turf in front of the deck. <br /> Motion rade, seconded and unanimously carried for a Negative Determination <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.