Laserfiche WebLink
Motion made, seconded and unanimously carried for a Continuance ont l 7:09. <br /> . <br /> 7:09 peri Gregory and Elizabeth Stento,AOC-- 155 Popponesset Island load (landscape changes) <br /> Dan Solien of Horiuchi Bonen Landscape Architects in Falmouth addressed the Commission on behalf of <br /> the applicant regarding minor site design changes. The pool and spa project was initially approved in <br /> early December and has been constructed and the house is now under construction. The landscaping <br /> architecture has been introduced later in the process so changes from the original approved plan are now <br /> being proposed. Mr. Solien indicated that the tan colors on the plan represent new proposed structures <br /> and the dark brown represents previously permitted footprints. Most of the work is located in the front <br /> and side yards. Among the suggested changes, Mr. Solien proposes decreasing the pavement near the <br /> porch and street and adding slightly to the walkway between the house and the street. on the left side <br /> yard facing the house, Mr. Solien proposes that the planter be moved out by 2 feet to accommodate a <br /> generator and four air conditioning compressors due to flood plain requirements. Additionally, a vault <br /> containing the pool equipment will be located near th6 fireplace and will be out of view. On the right side <br /> yard, a walk will be added from the driveway to the rear door of the garage. In the back yard, the <br /> applicants wish to add a 4 foot diameter stone gas fire pit. The gas line will be flexible and run beneath <br /> the lawn. Additionally, a dock to be removed and discussed at a later date, will allow for the removal of <br /> path. The project Will add 184 square feet of coverage, however, mitigation has been.expanded by 400 <br /> square feet. Light green areas on the plan represent mitigation native plantings and the dark green areas <br /> represent ornamental areas which are located primarily in the front and side yard and around the porch. <br /> Shrubs adjacent to the 5 foot high porch will be approximately 4 feet tall. Conservation grass will be <br /> used. Assistant Agent Leidhold questioned the original plan depicting a pervious driveway with a <br /> cobblestone apron which has been replaced with dry laid cobblestone, which is considered impervious in <br /> Mashpee. 1r. Solien indicated that they will abide by the original permitted driveway and will submit an <br /> updated plan with the material to be used. A silt fence will be installed to prevent erosion during <br /> construction. Mr. Shen confirmed that the mitigation plan has not changed greatly and would be happy <br /> to provide greater detail to the Commission. The Commission wishes to receive a new plan with details <br /> to include the driveway and plantings. <br /> Motion made, seconded and unanimously carried to Approve the Amended Order pending revised <br /> planting plan and revised plan of record slowing pervious driveway. <br /> Motion made, seconded and unanimously carried to adjourn at 7:36 pin. <br /> Respectfully submitted, <br /> Jen r A lrf d <br /> Board secretary <br /> 3 <br />