Laserfiche WebLink
flood zone is B23 which involves Chapter 91 and they will also need a LAS Army Corps of Engineers permit <br /> which they have filed for. As New Seabury owns the easement along the entire front,they were required to <br /> sign the NOI along with the proper owners,Mr. Williams and Mr. Segal. This gives their authorization to <br /> proceed so that BSC would have an access agreement with there to repair the sea galls that are required to be <br /> maintained under SE 43-604 and its superceding Order of Conditions issued by DEP. <br /> Chaim an Fitzsimmons asked Mr. Hayes if they would need to build a road again in which Mr. Hayes replied <br /> that they would not. During low tide, they can drive right below the MI-IW, come down through Maushop <br /> Village which they have an access agreement. Division Marine Fisheries will not allow any construction <br /> until after the 15th of September and then requires thein to be off the property by April 15. BSC will be <br /> working with Rock Landing to assure them that there will be an access agreement with then as well, same as <br /> they have with Maushop village and New Seabury, should they go on their property. Agent McManus asks <br /> Mr. Hayes how equipment will reach the areas where the level is below M W arta Mr. Hayes responded that <br /> they will be bui <br />