Laserfiche WebLink
Motion made, seconded and unanimously carried for a continuance until 1121!10 @ 7:12 p.m. <br /> 7:12 Jamie shone Idol—SE 43-2600 (49 Tide Faun) Demolish 1 Rebuild cont'd-to 210417 @ 7:OOPM) <br /> Steve Wilson is representing the homeowner. Chairman Fitzsimmons mons asks Mr. Wilson if they will be <br /> requesting a continuation and Mr. Wilson confirms that there will be revisions to the patio area. They <br /> will be increasing the setback for the patio and buffer plantings. Chairman Fitzsimmons explains that <br /> it is mre sensible to wait to present the project until the time that it has been continued to so that the <br /> revisions can be incorporated into the presentation but he does understand that Mr. Wilson would still <br /> like toy briefly explain the project. <br /> Mr. Wilson explains that this property had a fire in September 2009 and the first plan developed was <br /> to move the house back further away from the coast bank; however, the proposed raised patio and <br /> pool are in very close proximity to the coastal bank, They will be working on a revised patio layout <br /> and increasing the buffer and setback to about 10' for the full length of the coastal bank which is <br /> about where the existing house is now. Mr. Wilson is asking for a continuance'to February 4. <br /> Agent McManus states that he had asked Mr. Wilson to come forward to see if any of the <br /> Commissioners would have any questions regarding the proposed project. Agent McManus inquired <br /> about the impacts of construction (heavy equipment, etc) in such close proximity to the top of the <br /> coastal bank and asks Mr. Wilson when he returns with the revised project and re-established work <br /> limit, if they can pay special attention to not disturbing the trees lining the top of the bank. He is most <br /> concerned with the digging depth and what kind of impact it will have on their root systems and also <br /> the stability of the top of the bank. Mr. Wilson states that they will establish the work limit for the 1 <br /> house and construction and a second work limit for the re-plantings. <br /> Mr. Sweet asks about drywells for drainage because the current landscape plans do not shover them <br /> and Mr. Wilson responds that there is a note that says that they will put them and it can be <br /> conditioned into the orders for such. Agent McManus recommends that they be shown on the new <br /> revised plans. <br /> Motion made, seconded and unanimously carried for a continuance until 210411 a@ 7:00 p.m. <br /> 7:15 David Goulden RDA 22 Ta frail !fay Replace Outside shower 1 Extend Wooden Walkway (after <br /> the fact) <br /> Phil Miller of Miller Starbuck construction is representing the homeowner. This is an application for <br /> replacement of the exterior shower and walkway. Mr. Shaw asks if the shower is connected to the <br /> septic system and Mr. Miller responds that It is not. currently it is a 2 grade shower but he has <br /> discussed the situation with Agent McManus and it will be connected in the near future but the ground +` <br /> is presently frozen. Agent McManus says that the ICDA can be conditioned to state that the drainage <br /> must be hooked into the existing plumbing and the contractor/owner will need to provide proof of the <br /> work. <br /> Motion made, seconded and unanimously carried for a Negative Determincition with Conditions <br /> Lotion made, seconded and unanimously care'ied to move to Executive session at 7:40 pin <br /> esp f ally submitted, <br /> OAI <br /> iris arpnter <br /> Administrative Secretary <br />