Laserfiche WebLink
The deck currently is incomplete but still no contact from the owner. The next step after the certified <br /> mailing of the Enforcement Order(after 10 days) is to implement a daily fine until it is resolved. <br /> 5) News & Updates: <br /> 0 NRCS Grant Money Update (6/22/10 site visit): A site visit has'been scheduled for June 22 at the <br /> santuit Pond Darr. The parameters of the grant money currently will be fish ladder repair and the <br /> storm runoff abatement. The fish ladder is tied to a structure that is failing at the santuit Pond Dari <br /> and the N CS inspectors are requesting that the parameters of the grant money be expanded t <br /> cover some of the damage. They are positive about the Johns Pond outlet fish ladder and will build <br /> additional retaining walls to retain the sand that is corning into the pond and filling in the waterway <br /> which can clog the fish passage. They will also create a rock gabin gall on the other side of the <br /> pond because it is a vert steep embankment. The water runoff abatement is at the end of <br /> Iashpee Neck Fad at the Town Landing and the water runoff goes right into Shoestring Bay <br /> which is a shellfish habitat. They are discussing a possible diversion Swale. <br /> • F egs Sub-Committee Meeting Date: The agent would like to establish a date for the next <br /> meeting. <br /> • scheduling of site Visit to Eel River r in Plymouth: Over the net couple of weeks, the Agent <br /> would like to schedule a visit to the Bal River in Plymouth since that is where the restoration project <br /> is occurring that is similar to the Quashnet Fiver project. They are just about half way through and <br /> are in the planting phase. <br /> • Re-Cap of Quashnet liver site Visit (Haley/Aldrich Deport): The people from the Eel Firer <br /> Project N CS were out to visit and Steve Hurley stated it was logical to do the full realignment t <br /> the western side of the bog. The wetland that was created from the berm failure will continue t <br /> exist as a wetland but the river will be diverted away from that area so the siltation will not keep <br /> building up and slowing the flow of the river. If it continues, it will become more like a swamp rather <br /> than river. The Airforce will be providing the funding so the Agent believes that it is time to bring <br /> Haley/Aldrich back in. <br /> i • site Visit to Garner Farley Bogs: Need to schedule a visit to Garner Farley Bogs to finalize the <br /> lease agreement with Fred Bottomley. <br /> i <br /> 0 Game Installation: J hu Pond 1 Red Brook Road: A gate will be installed at Jehu Pond <br /> Conservation Area off of Great Oak Road South. There is a sinkhole that has reformed at Abigail's <br /> Brook again that he believes was created by large vehicles that are probably dumping landscape <br /> debris. Mr. sweet recommends discussing proactively to create an area for a turn around. <br /> M. .U. with Trustees of Reservation M shape Fiver Woodlands): The Trustees of <br /> Reservation for the Mashpee Firer Woodlands have a created a sign with our Town seal and <br /> Trustees of Reservation n along with the Mashpee Fiver Woodlands. They are also starting on some i <br /> trail work, removing portions of the split rail fence and cleaning up the parking lot. Boulders will be <br /> placed lining the parking area. An Eagle Scout has created a trail neap of the entire l lashpee Fiver <br /> Woodlands and GIS/Tom Mayo will be asked to reproduce the reap which will be available in the <br /> new kiosk at the north parking lot. It is being discussed to install a railing at the trail that leads down <br /> to the Trustees parcel because of the safety concern. <br /> Roadside Clearing at Pickerel Cove Recreation Area: The Fire Department cleared both sides <br /> f the road that leads into the Old Vin Haven / Pickerel Cove recreation area. There was a small <br /> brush fire a little while ago. <br />