Laserfiche WebLink
General Discussion: Mr. Sweet asks if there is any information when DPNH will be putting gates <br /> up and the Agent says that he has been talking to DPW on a daily basis although the situation at <br /> Santuit Pond has been taking precedent. The Agent mentions that there is extra funding in the <br /> Wildfire budget to purchase extra gates and also the Federal Department stated that they have <br /> gates but unfortunately has not really moved on the project. <br /> Hearing Aend <br /> 7:00 Rose Connors sunset Circle) Upgrade septic system RDA <br /> Applicable Resource Area: Buffer Zone to Inland Bank/Johns Pond <br /> Pete McEntee is representing the homeowner and explains that there is not a septic failure but had <br /> the tank pumped and the owners would like to be proactive and upgrade the system. Agent <br /> McManus states that the Board of Health has signed off on it. There are no issues and he would <br /> recommend a Negative Determination. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> 7:03 David Ferris SE -2608 sensett Point lid.) Construct extension to existing licensed dock <br /> (with maintenance in perpetuity) N01 Con ed to June 24 @ 7.18pm <br /> Applicable Resource Area., Land Subject to Coastal Storm Flow, Land Under Ocean, Salt marsh <br /> Cape & Islands Engineering has requested a continuance. <br /> Motion made, seconded and unanimously carried for a continuance until 6124110 at :1 pm <br /> .lanes Regan (1140 Algonquin) ' x 8' deck, front yard loam and seed, check & repair drywelIs <br /> RDA (Removed Vista Pruning— needs to be submitted as N01) <br /> Applicable Resource,area. Inland bank to Ca a uin Pond <br /> James Degan is requesting for approval for this portion of the project to build the deck, loam and <br /> seed front yard and repair the drywells. Agent McManus states that it is straight forward and <br /> recommends a negative determination. <br /> Motion rade, seconded and unanimously carried for a Negative Determination <br /> 7:09 Ares Degan SE 43-2611 Cayuga Avenue) New 68' Seasonal Dock N01 <br /> Applicable Resource Area.Joins Pond <br /> ( like Borselli from Falmouth Engineering is representing the applicant and has prepared the plan for <br /> a ' seasonal dock. The dock is a prefabricated aluminum seasonal dock and is the same system <br /> as other applicants on Johns Pond. They will be placed on concrete block footings that will be set in <br /> place as permanent markers so that the dock can be removed and put back each season. Agent <br /> McManus mentions that since Natural Heritage has not commented as of yet, he would recommend a <br /> continuance. Mr. Gurnee made a comment that he would like to see more detail regarding the 1 <br /> posts. Chairman Fitzsimmons asks about a platform shown on the plans. Mr. Borselli explains that <br /> the platform is an existing platform and that they would like to move it into the water and connect the <br /> aluminum dock to it so that it is more functional as a connection to the shore. The Chairman states <br /> that platforms are not allowed. Agent McManus suggests cutting the platform down to the same <br /> width as the dock. Mr. Borselli explains that the platform has historically been in the water but it is <br /> brought onto the shore during the winter. His idea is to keep using as that and to attach the new dock <br /> to it. Mr. Borselli also believes that this platform should be grandfathered as it has been used on this <br /> property for many years but the Agent explains that because it is being incorporated into a new <br /> r <br />