My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/22/2010 CONSERVATION COMMISSION Minutes
>
7/22/2010 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 5:27:21 PM
Creation date
3/5/2018 3:06:11 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
07/22/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Also, it ends up on the surface of the lakes which will restrict in lake usage. <br /> Lotion made, seconded and unanimously carried to Close and Issue <br /> 'All material.submitted for heags can be found on Conservation Flash Drive dated 7/1/10 <br /> Updates: <br /> New signage in for Pickerel Cove Recreation Area (picture on PowerPoint): Richard hard Pa vlak <br /> finished the new sign and installed it. Agent thanked Mr. Pawlak for doing a great job. <br /> • Regulation n 2 : Docks and Piers — Float sizes: Agent McManus has received a lot of <br /> feedback regarding the 150 sf size restriction that was put in plane a while ago and it was <br /> mentioned that it is very difficult to maintain stability. The Agent would like to discuss at the ret <br /> subcommittee meeting possibly evaluating the property and charging by the square footage of <br /> the float. <br /> Roll Call to add following issues <br /> (All Co mrrmi ion rs agreed to add following items Post discussions) <br /> 1. Emergency Certification gyres issued to DPV for a sink hole that formed in the ;'pull offer area next to <br /> Mills Pond. The DPM! Director stated that it needed to be addressed immediately as it was spilling <br /> run off garter directly into Mill Pond and thus into the herring Fury. <br /> 2. The NCS has denied two of the three projects; the Santuit Fond Dam & Fish Ladder and the <br /> Johns Pond Fish Ladder. The Agent mentions that he will need to search for alternative funding a <br /> the Santuit Pond Dara is a hazard and could possibly fail. The one project that did get approved i <br /> the Storm Water Run Off Abatement at the end of Mashpee Neck Road getting into Pirate's Cove <br /> Marina and the shellfish beds. The funds estimated for this repair were $177,000 and NRCS will be <br /> contributing % ($132,750), non-federal 25% is $44,250 and "in find" estimated i $35,400. This <br /> affects 102 acres of shellfish growing area. <br /> Motion made, seconded and unanimously arrrled to adjourn the meeting at 8:35 pm, <br /> lepetf ll,r submitted, <br /> Cris Carpenter <br /> Administrative Secretary <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.