John Slavinski i from Cape & Islands Engineering agrees that the two maps do have discrepancies but <br /> one difference is that his plan shows a "hay bail" lire and the landscape plan shows the landscaper's <br /> "work limit" line. There are no grade changes. Agent McManus asks about the stairs and Mr. <br /> Slavinski confirms that it is a discrepancy but it will be his plans that will proceed to the Building <br /> Department and not the landscapers. The Agent also inquires about the suggestion from III . Wilson <br /> regarding the access way and if there is a way to reduce the number of trees to be removed. Mr. <br /> Vaccaro states that it is the preferred access to the back of the yard and they will restore vegetation <br /> in that area. Agent McManus states that the requirement will be a 1:1 ratio replacement of whatever <br /> is disturbed in that area. Mr. Vaccaro would like to point out that most of the trees in the access way <br /> are black pines. <br /> Ms. Wilson asks Mr. Slavinski to clarify that there will be no fill added to the area of the octagon room <br /> and Mr. Sl vinski confirms that there is no intent to fill anything on the entire project. The elevations <br /> shown are for the deck. Agent McManus suggests submitting a new landscape drawing and for the <br /> Burd to rade a motion contingent on revised plan. Mr. Vaccaro would like to withdraw the <br /> landscape altogether and to proceed with the engineering site plan only. <br /> Richard hard Howley, an abutter, addresses the Board in regards to the landscape plan and he would like <br /> to request that a decision not be made until the landscape plan is submitted. Agent McManus <br /> explains to Mr. Howley that engineering plans can be submitted for approval without a landscape plan <br /> and that the engineering plan is only for the structure. The applicant will have to come before the <br /> Board again with an Amended order request for the landscaping and that all abutters will then be <br /> notified by mailing for this hearing. <br /> Motion made, seconded and unanimously carried to Close and Issue for the Engineered Site Plan <br /> only. <br /> 7:15 David & Ana Ferris SE 3-2618 (24 Se onsett Point Fid.) Construct ramp, pier &float in Little <br /> River Vol C 'd to 8119110 @ T,15 <br /> Resource Area: Land Subject to Coastal Storm Flow, Land Under ocean, Salt marsh <br /> Applicant requests a two week continuance. <br /> Motion made, seconded and unanimously carried for a continuance until 8/19/10 at 7:1 prn <br /> 7:18 Mashpee DPI( (Route 130 Main Street) Remove overflow pipe and install 600 gal. leach pit <br /> connected to catch basin Cont'd to 8119110 @ 7:06 <br /> The Director of Dept. of Public works has requested a two week continuance due to a scheduling <br /> conflict. <br /> Motion made, seconded and unanimously carried for a continuance until 8119110 at :c pm <br /> 'All material sumed for hearings can be found on Conservation Flash Dfive dated 711110 <br /> Roll Call to add followincy issues <br /> - <br /> All Commissioners agreed to add following items Post discussions) <br /> 1. AFCEE/ uashnet update: Doug Allen from Haley & Aldrich is ready to move forward with the <br /> realignment of the Quashnet River. They came in to discuss wrap and game plan and suggested to <br /> meet with Mike Minior who is with AFCEE for a discussion and also Stere Hurley who has <br />