Laserfiche WebLink
Resource Area. Coastal BanklBuffer to Coastaf Batik <br /> David French from Christopher Costa and Associates explains that they would like to replace the <br /> failing retaining wall at the edge of a brick patio that surrounds an existing in-ground pool with an <br /> engineered concrete or mason wall using in general the same design and height. The request also <br /> involves the replacement of the eiting brick patio which has started to' fall apart and the slope i <br /> becoming steeper as the failed gall is washing out underneath. The patio is the carne footprint with <br /> a couple of areas of,wooden steps leading to an existing ramp and float. The steps will be replaced <br /> with granite rocks. Applicant would also.like to build a new walkway with a retaining wall on the <br /> side of the house. Machinery that needs to be brought in will be brought in on the garage side of <br /> the house and once the wall is in plane, they can then stabilize behind the wall and start work on <br /> the patio area. The patio will be replaced with paver stones. Mr. Gurnee asks about the d rywell <br /> and Mr. French'explains that it will catch the roof run off instead running across the patio. <br /> Lotion rade, seconded and unanimously carried to Close and Issue <br /> 7:12 Mashpee DPW Pointe 130 Main Street) Remove overflow pipe and install 600 gal. leach pit <br /> connected to catch basin RDA (under Emergency order) <br /> Resource Area: Ri er`ront: Mashpee Rl er He ung Run <br /> Catherine Laurent, Director of DPW explains that the work has been ,completed under an <br /> emergency order by the Agent. The work was an existing drainage area on Route 130 at the little <br /> turnoff by the hill Pond across from the Herring Run. There was ars existing catch basin that had <br /> an overflow pipe into Mill Pond that had been there approximately 30 years and had rusted enough <br /> to collapse and caused the pavement above it to collapse. DPW removed the pipe so that there is <br /> no-longer an overflow pipe into the. pond and added a boo gallon leach pit. Agent McManus <br /> mentions that it i good that there is no longer any runoff going into the pond and that this,was <br /> certainly an upgrade. Mr. Gurnee asks if the table was lover enough for the leafy pit to do its job and <br /> 'Ms. Laurent confirms that itis losing a bit of water and it is a smaller search pit than they normally <br /> would install. At some point, they may add some additional drainage up hill to try to capture some <br /> of the run off. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> 7:15 Steve Mittleman 1 Shore Drive) Create/construct wanking path, remove creosote timbers <br /> and replace with dry laid stone wall, removal of invasive plant species and <br /> replantlrevegetated, Nista Pruning N01 <br /> Resource Area: Inland Bank leading to Deans Pond <br /> The applicant requested a continuance to September 16. <br /> Lotion made, seconded and unanimously carried for a continuance until 9/16/10 at 7:03pm <br /> 7:18 George Mandalos 22 Crosstre Way Install well and sprinkler heads RDA <br /> Resource,area: Buffer zone to Coastal Bank <br /> Mr. Mandalos requests permission to install a new irrigation system and a deep well. Agent <br /> McManus questions the depth of the well and whether it will draw salt water and suggests to Mr. <br /> M ndalos to take care when constructing the well. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> 3 <br />