My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/7/2010 CONSERVATION COMMISSION Minutes
>
10/7/2010 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 5:07:03 PM
Creation date
3/5/2018 3:07:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
10/07/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' a <br /> 7:18 Glenn Wong SE 3-2626 01 Tide Run) Demolish J Rebuild single family home , NOI <br /> Resource Area* Buffer zee to salt marsh,, Lard Subject to Coastal Storm Flow <br /> Jack Vaccaro from Vaccaro Environmental Consulting is the representative for the homeowner and <br /> explains that this property is on J hu' Pond and is almost entirely in the Waquolt Bay ACE.C. They <br /> were previously approved for vegetation rehabilitation due to unauthorized clearing. The site is very <br /> gradually sloping so there are n ,coastal banks. The only resource areas of concern are the most <br /> landward bordering vegetated wetland and land subject to coastal storm flog. The proposed home <br /> will be larger but the extension of the structure is towards the street and will end up with less <br /> structure within o' f the wetland. They will be installing a de-nitrification system and providing <br /> mitigation. They also are looking for approval to improve an existing storm water outlet which is <br /> along the south side of the property by installing a rain garden which would reduce harmful <br /> components of St rrnwater as it flows through the mulch and plants. It would reduce sediments <br /> that otherwise would make its way down to the wetland. It is approximately 400 sq. ft. in the <br /> depressed Swale between the existing outlet and the wetland. They are also proposing the <br /> standard drywells, four of there around the perimeter of the house to help improve the infiltration of <br /> roof runoff. Agent McManus asks if the pool/patio edge is going right up to the snotubes or the <br /> extent of the cantilevered deck and Mr. Vaccaro says it will extend to the cantilevered dei . Agent <br /> McManus asks about the path along the edge that was permitted at the last hearing and if it was <br /> going to affect the approved mitigation. Mr. Vaccaro explains than there will be a vertical wall right <br /> at the edge and the existing grade will not be changed. There will be the patio with no rear lawn <br /> and they just warted a strip at the base of the wall which does not go into the previously approved <br /> area of plantings. He alsoelievres the project will start a soon as possible so that the mitigation <br /> can be completed by spring. es <br /> McManus reads for the record the Board of Health's comments <br /> which states that the ap li ati n'h s been submitted and is under review. <br /> John Slavinski from Cape & Islands Engineering explains that this project does not need to go t <br /> Zoning as it is a coastal subdivision which conforms to current zoning in the Town of Mashpee and <br /> will not need any variances requested. The new construction will meet the regulations for this flood <br /> zone. <br /> Motion made, seconded and unanimously carried to Close and Issue <br /> 7:21 Leslie Caffyn 1Popponesset--Island Road) New Title V septic, remove garage, install I water <br /> line & pump, fill existing cesspool — RDA <br /> Resource Area: Buffer Zone to Coastal a klu e Z ne to Salt Marsh <br /> John Slavinski from Cape & Islands Engineering represented the home owner and explains that <br /> there is an old frame of a garage,that gill need to be removed it order to install the new septic in <br /> than area which is more than 50 "from the top of the coastal bank. The septic system is state of the <br /> art. It is innovative and alternative; a pump with a wall around it is being installed so that it won't be <br /> above ground; a portion of time system will have denitrification; and an ultra violet light is being <br /> added that will treat the effluent as it comes out of the`Fast system through the D-Box and headed <br /> towards the leach field. Eventually this property will be a year round resident. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> n <br /> 7.24 Marianne & Mark Townsend SE 43-2627(16 Deans Hollow Road) Eradicate invasive and non- <br /> native species, removal of hazardous trees and planting of native species with maintenance <br /> in perpetuity <br /> Resource Area* LSCSFIBufferto Coastal anklDue <br />
The URL can be used to link to this page
Your browser does not support the video tag.