Laserfiche WebLink
4) uashnet Fiver Pro'ect: The Agent has been in touch with Doug Allen from Haley 'Aldrich who <br /> has been working on the timeline to complete the feasibility study of the test hole-borings to make <br /> sure that the rerouting of the river is in the ideal location. The Agent is still waiting on a date for <br /> the shut down of the plant to see hover the natural water flow takes over. <br /> 5) Mslee Land stewardship Program- Agent McManus will be organizing another meeting as he <br /> has several projects that some volunteer help would come in handy. Flanging from trail projects <br /> to overall parcel cleanup days. He -states that the Land Stewardship Program has slid off and the <br /> only excuse is that there just is not enough time without an assistant. <br /> Mr. Cross comments that they really need to clarify standards for submittals and Mr. Sweet agrees and <br /> says that it should be procedural at first submittal at the office before.it is scheduled to be heard. <br /> Mr. Gurnee states that there have been a lot of inconsistencies lately as for example ple tonight with two <br /> projects that he felt the Commission was much more lenient than they normally would have been with <br /> any homeowner. Agent McManus clarifies to the Board that he asked this particular applicant to come <br /> before the Board because they are the final decision makers and he was unsure about ghat the filing <br /> procedure should be so his next option was to have there come in and present their project so that the <br /> Commission can make a determination of filing. <br /> M otion made, seconded and unanimously carried to adjourn the meeting at 9:03 pre. <br /> espe tfully submitted, <br /> Iris carpenter <br /> Administrative secretary <br /> *�'*A 11 material s ubmittedfor hearings czin be foundConservation Flash Drive dated ` � <br /> 7 <br />