My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/4/2010 CONSERVATION COMMISSION Minutes
>
11/4/2010 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 5:09:02 PM
Creation date
3/5/2018 3:08:47 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/04/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and they should take advantage of the assistance. There is a meeting on the g#" that he will be <br /> attending with the Leisure Services Director because they are also looking to take advantage of <br /> this project with a possible Summer Day Camp. <br /> HEARINGS <br /> 7;00 Carl Leppo (109 Waterway) New Title V Septic System - <br /> IRDA <br /> Resource Area: Flood Zone A <br /> Materiai sLibmitted., Plan - Sewage Disposal Repair Design 9115110 Christopher Costa & Associates <br /> Matt Costa from Christopher Costa & Associates proposes to upgrade an existing septic system. <br /> The current failed system is in the back of the property and they will relocate the new system to the <br /> front of the property. Agent McManus states that the resource area is Flood Zone A and the lot i <br /> approximately Zoo' from the nearest coastal bank. The entire lot is mostly disturbed so no impacts <br /> to vegetation will result from this project. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> 7:03 Fran Feavey Cayuga) shelled Boat Area (ATF) - RDA <br /> Resource Area. Buffer zone to d Baok <br /> Material pitted: Pian - Plan of Wooden Wheelchair Ra and drawn seasheil a ea Cape <br /> Island Engineering <br /> Mr. Reavey arrived late and was voted in to be heard instead of acontinuance) <br /> Fran Reavey explains that he put some shells clown for the boat area and beyond that; he cleared <br /> vegetation.that was beyond.the buffer zone. Agent McManus states that on the other side of the <br /> house is inland bank leading down to Johns Pond and that Mr. peavey had cleared ars area that <br /> was just ground cover and crab grass. He established the clam shelled driveway without-realizing <br /> that it was within the buffer zone to the tap of the inland bark. The area of clearing is within the 50- <br /> 100' buffer but it was 100% disturbed already so there is no mitigation that corner into play. They <br /> would like to bring everything into compliance. <br /> Motion made, seconded and unanimously carried for a legative Determination <br /> 7:06 David Blesoff Pickerel Cove Circle) New Septic System RDA <br /> - <br /> Resource Area* an bank leading Mashpee Wak by o <br /> Mater submitted: Plan - Proposed Septic, System U goade 10/18/10 Engineering Works; Inc. <br /> Peter McEntee from Engineering works explains that the owner wishes to upgrade his septic <br /> system. The existing system is a cesspool and lies within 3' of an inland bank but they will require <br /> a variance. The Agent states that the project is straight forward and any kind of improvement that <br /> moves the septic further away from inland bank and water resource is always beneficial. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> 7:09 stendahl,D nd s SE 3.2622(251 Shore Drive) Create/construct walking path, remove <br /> creosote timbers and replace with dry laid stone wall, removal of invasive plant species and <br /> replant/reveetated — NI Cn `d from 10121110 <br /> Resource Area: Inland Batik Leading to Deigns Pond <br /> Material submitted: Plan - Stendahl Place Condominium 8116110 Casey Landscaping <br /> Brian Casey from Casey Landscaping explains than the main objective is to get safe access around <br /> the back of each unit and have pathways to Deans Pond. He states that there are existing creosote <br /> walls that they'will take down and reconstruct the driveway gall. They will use bluestone stepping <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.