Laserfiche WebLink
The most restrictive resource boundaries are the buffer zones to the coastal bank and an attempt <br /> has been made to avoid work within that buffer zone but they will have to run sections along that <br /> area on ocean Bluff Drive. The existing units will be abandoned and filled with clean sand. It <br /> should'be a three week operation; the.first week being for construction and mobilization, installation <br /> of the main line and begin installation to the hook-ups to the service units. The second week is for <br /> completing those installations; tie service in to the mein line, testing of the pumps, grinders and <br /> panels; and the third week, if the weather is permitting, start up the system. Agent McManus would <br /> like to clarify why this is an RDA and riot a Notice of Intent since there are resource areas on both <br /> sides. He explains that it is taking place in an entirely hardaped area ar�d the plans provide <br /> enough detail,with the contour lines. Mr. Sweet asks if all the houses are being hooked up and Ms. <br /> Mahoney responds that all but one will be tied in but that one will be provided a stud for future <br /> connection. Mr. Gurnee asks if there is only one grinder unit per household and Ms. Mahoney. <br /> confirms that and also states that there is enough storage capacity that if It should fail, it will sound <br /> an interior/exterior alarm. Most homes have emergency generators and the homes, that currently <br /> do not have one, have elected to purchase one as part of the project. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> :21 William & Sarah Sullivan SE 3-.2610 (180 Daniels Island Road) Restore vegetation to <br /> construction area access lane-as required - <br /> Resource area: Buffer to coastal bankl LSCSF <br /> Material submitted; Proposed Landscaping 5 Cape & Ism ds Egfoeerfng <br /> Jack Vaccaro from Vaccaro Environmental Consulting and explains that a construction access on <br /> the side of the house was allowed with the original Notice of Intent. At that time, it was conditioned <br /> that the'Sullivah's corne back Frith a detailed restoration plan for the access lane. They are <br /> proposing 13 additional trees along the property line and about 20 shrubs. It is a pretty dense <br /> planting and it is intentionally so as to provide a good buffer to the neighbors. Agent McManus <br /> states that the project has a pretty straight forward planting list and it will enhance the privacy. <br /> Motion made, seconded and unanimously carried to Close and Issue the Amended order of <br /> Conditions for SE 43-2610 as proposed <br /> 7:24 Evelyn Burke Lisa Lane) New title V System -• RDA <br /> Resource Area. E3 uffer.gone to-wetlan dl Isolated Land Subje of To Flooding <br /> Material sub,-fitted: <br /> Darren Meyer is representing the homeowner and states that the proposal is to upgrade a failed <br /> system that is in the bank yard. They would like to put in a new tank and'pump and move the <br /> leaching to the front yard which will put the flow over 100' from the resource arca. The work within <br /> the buffer zone is removing the existing tank, reproving-the existing leach pit and adding the new <br /> tank and pump. Agent McManus states that there is some concern with the Board of Health Agent, <br /> Glenn Harrington who had asked the Agent why the whole system couldn't be placed in the front <br /> yard. Mr. Meyer states that the initial plan was going to be done by Mr. Harrington who proposed to <br /> put the tank and pump in the back and the leaching in the front. The owner had a few questions <br /> and the Health Agent thought it be best to have an engineer do the design. Mr. Meyer has not seen <br /> the basement yet to determine if it's possible whether the plumbing could be-reversed. The Agent's <br /> recommendation is for a continuance until Mr. Meyer meets with Mr. Harrington. Mr. Gurnee asks <br /> why do they need to remove the tank; why net just fill with sand. Mr. Meyer'confirms that it can be <br /> filled. Mr. Gurnee asks Agent Manu why the tank and pump have to be pint in front because <br /> they do not normally leak and the Agent states that it was Mr.'Harrington's recommendation. <br /> Lotion made, seconded and unanimously carred for a continuance until 12116/10 at 7:03pm <br /> 4 <br />