My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/10/2011 CONSERVATION COMMISSION Minutes
>
3/10/2011 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 3:16:48 PM
Creation date
3/5/2018 3:16:33 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
03/10/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Motion made, seconded and unanimously carried for a Negative Determination <br /> 7:09 Essence Landscaping SE 43-2650 (39 Sunset Circle) Remove timber retaining wall from <br /> inland bank and replace with masonry block wall 5' further back from water's edge - NOI <br /> Resource Area: Inland bank, BVW and Pond Front <br /> Material submitted. Site Plan 212112011 Engineering Works, Inc. <br /> Jack Vaccaro from Vaccaro Environmental is presenting for the applicant. Mr. Vaccaro explains <br /> that they are proposing to replace a bulkhead that is in pretty bad shape of disrepair with a new <br /> block wall that will be approximately 5' back landward of existing wall. He explains that they would <br /> like to install the new wall first before removing the old timber wall. The new wall will be about 2' <br /> shallow and will use native material to pack down and lay the wall right on top. Mr. Vaccaro <br /> mentions that there is an area of bordering vegetated wetland by the southern end of the property <br /> but they will only be within 5' of the area. He also states that the pond is in a rare species habitat <br /> and that the mapped habitat does extend into the work area so they have had to submit a copy of <br /> the NOI to Natural Heritage and Endangered Species. Agent McManus asks if there will be any <br /> backfill to connect the new wall to the old wall because he is curious as to the purpose of the <br /> second wall where it is being graded to a sandy beach front. Mr. Vaccaro responds that the owners <br /> do use the area as a beach area and they are only trying to stabilize the shoreline at that location <br /> and protect the habitat from ice damage. Agent McManus would like to point out that if the owners <br /> have any intention of beach nourishment in the future then they would have to come before the <br /> Commission for that. Mr. Vaccaro agrees and suggests that it be conditioned in the Orders. <br /> Motion made, seconded and unanimously carried.to Close and Issue <br /> 7:12 Eric Benway SE 43-2649 (2 Point Road) Construct house addition, septic system <br /> alteration/relocation and driveway- NOI <br /> Resource Area: Buffer Zone to Coastal Bank; Buffer to Salt Marsh and LSCSF <br /> Material submitted: Proposed Site Plan 211612011 Cape & Islands Engineering <br /> John Slavinski from Cape & Islands Engineering is present for the home owners and he explains <br /> that when the house was first built, the lot next to this one was owned by someone else. Within the <br /> last two years, Mr. Benway was able to purchase that property so now he has a double lot and <br /> would like to put an addition onto his existing house. The addition will consist of a living room, <br /> garage and an additional bedroom. Mr. Slavinski states that they are going to lift the leaching part <br /> of the septic system and move it 12' more away from the BVW. Agent McManus reads the Board of <br /> Health comments for the record which states that the application is under review. The Agent also <br /> mentions that he had a prior discussion with Mr. Slavinski regarding mitigation regulations which <br /> had not become regulated until 2005 and this house was built in 2000. Since they are removing <br /> natural vegetation within the 50' buffer to coastal bank in a small area of the lot for the addition, <br /> there will be opportunity for mitigation and Mr. Slavinski said that he spoke to his client who is <br /> happy to oblige. <br /> Motion made, seconded and unanimously carried to Close and Issue <br /> 7:15 Marianne Townsend (16 Deans Hollow Rd) & Scott Murray (21 Squaw's Lane) Restore <br /> degraded coastal dune and portion of buffer zone with maintenance in perpetuity- NOI <br /> Resource Area: Coastal Dune, LSCSF& Buffer to Coastal Beach <br /> Material submitted., Proposed PBA Dune Restoration Planting Plan 212312011 Talbot Ecological <br /> Land Care/Proposed Restoration Plan 212112011 Cape & Islands Engineering <br /> Michael Talbot from Talbot Ecological Land Care briefly describes the history of this property and <br /> that the Commission had issued an Order of Conditions to 16 Deans Hollow Road for the removal <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.