7:12 Todd & Dena Pav ne SE 43-2664 166 Waterway) Demo/Rebuild SFH with driveways, pool <br /> Not Contd from 6 611 <br /> Resource Area. Ccsl'al Bank; LSCSF. Buffer to Salt Marsh; Land Under Ocean <br /> Material submitted* Plot Plan ReconstructHouse Pgs 1-4 6128111 BSS Design r`Buffer Ship <br /> Restoration 6,711 Vaccaro Environmental Consulting <br /> Jack Vaccaro from Vaccaro Environmental is representing the applicant and explains that this <br /> property was previously approved for a demo/rebuild in 2008 with orders that are still valid but the <br /> new owners prefer a different footprint. The new structure will be built further back from the creek <br /> but would like to create a pool on the creek side so there is a net increase in structural footprint <br /> towards the creek. It will be required for the applicant.to provide sufficient mitigation to offset the <br /> increase in hardscape within 1 0r of the resource area. Mr. Vaccaro would like to remove the lawn <br /> area in front of the creek and restore it back to its natural state with native shrubs. The mitigation <br /> requirement would just be under 2000 sq. ft. of plantings and the applicant is supplying just over <br /> 2000 sq. ft. Mr. Vaccaro mentions that this project has been reviewed and approved by the Zoning <br /> Board of Appeals. Agent McManus inquires about the remnants of an old bulkhead wall associated <br /> with the property that currently extends out into Poppone sett Creek and Mr. Vaccaro expects that <br /> the gall will be addressed in the future. Villa. Sweet asks about the changes to the drainage on the <br /> proposed project and Mr. Vaccaro states that the engineer has designed a series of infiltration <br /> basins. <br /> Motion made, seconded and unanimously carried to close and Issue <br /> 7:15 Kenneth Par lski (357 I onomo co Road) Upgrade septic system to Title V RDA <br /> - <br /> esc Area. LSCSF <br /> MaterlW submitted* Plot Flea Existing t4ouse 6/16111, BSS s <br /> Tom Bunker from BSS Design requests approval for an upgrade to an a xisting septic system, He <br /> explains that there are two cottages that are each served by a separate cesspool. Both systems <br /> flow down to one septic tank and pump chamber and then pumped up to the highest point of the <br /> property. The n ew system wiI I be mo than o'f roan the wetl and s. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> 7;18 John Beasley Little Neck Lane) Rebuild dock in same foot Print- FDA <br /> Resource Area.- Land Under Ocean <br /> Ma te ria I submitted: Existing Dock& Wa A wa y 1012 }°9 1 F/Sal t Ma rs1 Staking Plan I OV'5`99 f`GIS <br /> Photos -owner <br /> Mr. Beasley explains that they are soon purchasing the property and would like to repair the dock <br /> that is in total disrepair. They would like to rebuild the dock and ramp in the same footprint which <br /> will include replacing the pilings. Mr. Gurnee comments thatthe drawing is different and Agent <br /> McManus states that they are going further out to reach a great water depth because when-the <br /> dock was originally built, the water was deeper in that area. Mr. Beasley.states that he is in the <br /> process of filing a Chapter 91 license for a new dock to bring it up to standard. Agent McManus <br /> informs Mr. Beasley of the required standards for plank spacing on walkways for the allowance of <br /> sunlight penetration to vegetation below the dock, <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> 7:21 .Jeffrey Cohen (1154 Fells Pond Fuad) Upgrade septic system -RDA <br /> Resource Area* Inland Bank,Buffer Zone to Pond Front <br /> Material submitted* Proposed Septic System .}1 7,11 Engineering Work, <br /> 6 <br />