My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/11/2011 CONSERVATION COMMISSION Minutes
>
8/11/2011 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 5:29:02 PM
Creation date
3/5/2018 3:31:22 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
08/11/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7:15 Michael Martone 3-2667 78 Buccaneer Way) Construct ' addition, rebuild existing deck <br /> and also replace failed septic system with new Title V- N 0 I C 0 n td fro m 7128111 <br /> Area:e : ffer Zone Rivet-front and inland Bank Masl7pee River <br /> Material submitted: Buffer Strip Restoration Plan 815111 Vaccaro En vironmentalCon sulting Site <br /> Plan 819111 J.E Landers-Gainey <br /> Jack Landers-Carley from J.E. Landers-Cauley mentions that he had presented the project two <br /> weeks ago and at that time, the Board was curious as to what the site looked like. Revisions t <br /> both sets of plans have been submitted. Mr. Landers-Cauley had met with the Agent onsite and <br /> discussed the modifications and carne to an agreement which is reflected in Mr. a ar 's <br /> restoration plans. Mr. Landers-Cauiey's plan shw.that the two trees that were originally flagged for <br />' removal have been revised t ; one tree being removed and one tree being pruned by cutting the <br /> lower branches. Agent McManus states that during the onsite, he was able to point out the specific <br /> pitch pines that have pine-bore damage and the Board was able to get a proper perspective of the <br /> current layout of the backyard. The area of grass will remain grass moving forward and the area of <br /> tangled mess of debris and invasive species will be replanted with native species. There will be no <br /> encroachment or manipulation of trees on the bank. Mr. Gurnee asks if there will be any kind of <br /> access to the water created and Mr. Martne states that he has not asked for than at this time and <br /> may carne back at a later date for than request. <br /> Motion made, seconded and unanimously arrried to Close and Issue <br /> 7:18 Genevieve Land Trust, Sandrar Larusso Trustee (246 Monomoscoy Road) Permit existing <br /> grandfathered dock - RDA <br /> I <br /> ResourceArea.- Buffer Z ✓ Johns and <br /> Material submitted. Hand Drawn 8/1/11 Owner <br /> Donald Lans, one of the trus'tees for this property, is requesting a permit for his 46 grandfathered it <br /> dock. Agent McManus informs Mr. Lans that it is now required to display the property address on <br /> the dock for identification. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> i <br /> 6) <br /> Waterways Commission Meeting: Moody Pond Proposal —Agent McManus attended the <br /> Waterways Commission Meeting to discuss restricting gas powered engines on Moody Pond and <br /> only allowing electric. The Commission was entirely in favor of the proposal. Net step is to get in <br /> touch with the Chief of the Environmental Police (EPO) and then draft a warrant for the Town <br /> meeting to be adopted into a bylaw. <br /> i 7 Regulations Sub-Committee Meeting Update- Regulation 29: Buffer Strips and N BS (Vista <br /> Pruning) —The revisions to the crista pruning guidelines have been seat out and highlikited in red <br /> print and the Agent asks the Board to review and prepare feedback for the August 259 meeting. <br /> Chairman Fitzsimmons has already submitted his comments which were also forwarded. After <br /> finalization, it will thea be promulgated by a public meeting at one of the Conservation hearings and <br /> then advertised in the Enterprise. <br /> Mr. Gurnee asks what the plan of procedure is for the C uashnet River Realignment proposal. Agent <br /> McManus states that fiat he would like everyone to review it and then he will try to get a fifth position on <br /> the steering Committee ideally from the Environmental Oversight Committee. The Agent says that he is <br /> still waiting for a financial picture from AFCEE. He has sent an email to Mike Minior at AFCEE asking <br /> him to put together a financial presentation. They are responsible for returning the entire bog system to <br /> its pre-existing condition. Agent McManus also states that he would like to ask for more quotes as Haley <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.