My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/3/2011 CONSERVATION COMMISSION Minutes
>
11/3/2011 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 5:02:31 PM
Creation date
3/7/2018 9:56:19 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/03/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7:00 Paul Sugarman 3 Tide Run) Remove broken/damaged pilings on fined pier and replace in <br /> the same footprint— RDA <br /> Resource Area: Land Under ocean, LSCSF, Salt Marsh <br /> Ma a is submitted, Plan Accompanying Petition 7094 Baxter NyeLittle River Boat) <br /> Mark Burns from Little River Boat Yard is representing for the homeowner and states that the end of <br /> the pier where the ramp ties into has fallen approximately o" lower. The piles are white oak and <br /> are about 25 years old. All 12 of the piles beyond the salt marsh need to be replaced. There is a <br /> Chapter 91 license that allows for repairs but beanie it is in ACEC jurisdiction; it should be <br /> presented before the Board. Mr. Burns explains that they will extract the old poles and put new <br /> poles in the sane exact place using a pile driver. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> 7:03 Louise DoolinQuail Hollow Road) Upgrade failed septic system RDA <br /> - <br /> Resource Area: Buffer Zone To Pondfront (Johns'Pond) <br /> Material submitted: Septic system Upgrade 1015111 CGE Engineering <br /> Ron Buko ki from CGE Engineering-is representing for Ms. Doolin and explains that the original <br /> septic system was constructed in 1974 and consisted of a 1000 gallon tank and a ' precast <br /> leaching chamber. They are proposing to pump} fill and abandon the old tank and leaching pit and <br /> install a new Title v system with a 1500 gallon septic tank and leaching field designed for a three <br /> bedroom home. The new activity is taking place on the street side. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> 7:06 ,James Norton Wheeler Road) Replace existing pressure treated timber retaining wall and <br /> steps in the same footprint - D :ontinu f m :tobe {20, 20.11 <br /> Resource a Area: Inland Bank Leading to A shumetPond <br /> Material submitted; Hand Drawn 1015111 Owner <br /> IIIb. Norton is requesting applicability to replace a 25 year old retaining wall that due to age and <br /> raised grater levels, have broken down the railroad ties. The replacement gall will be the same <br /> material and everything will be done by hand. It is recommended to IIIb. Norton to use a different <br /> material such as foundation grade PT le-vel which i much more durable and more likely to last <br /> approximately o years. Agent McManus informs Mr. Norton that he will need to fill out a form for <br /> the records that will shover the old material is being disposed of properly. <br /> Motion made, seconded and unanimously carried.for a Negative Determination <br /> 7:09 William Sandler Popponesset Island Road) Remove a tree from the back }hard that is <br /> diseased and hazardous to the dwelling - RDA Contin edfrom Dutcher 20, 2011 <br /> Resource Area*Buffer Zone to Coastal Bank(Poppy Bay) <br /> Material submitted: Town GIS <br /> Scott Campbell from Cardinal Tree and Excavation is representing for the home owner and explains <br /> that there is a tree on the property that is covered in moss and diseased. The roots are all exposed <br /> and it is now leaning towards the house. The homeowner is afraid that it will not make it through <br /> the winter and would like Permission to remove it. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> 7:15 Richard Maganiello Kim Path) Demo J Rebuild single family three bedroom home- N01 <br /> *Co # ,h ei r. , 20.1.1 7: 9 m <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.