My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/1/1978 BOARD OF HEALTH Minutes
>
2/1/1978 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2018 5:00:59 PM
Creation date
3/12/2018 1:18:41 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
02/01/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 February 1978 <br /> MINUTES OF THE BOARD OF BEkLTH1 <br /> i <br /> No cesspool construction permits issued for the week. <br /> Plumbing permit #46 issued to James Cannon $24400 <br /> Plumbing Permit #47 issued to James E. McBride $16.00 <br /> Sanitation issued ckr Trading Post $30.00 <br /> Upon reading and discussing the job description for <br /> Health Inspector for the Town of Mashpee, the Board voted <br /> unanimously to except h e job descri*p ion. <br /> Memo received from Mr. Holmes on 30 January t78 regard!-, <br /> i g the Hydrol c Study. <br /> . . . . says that in Mashpee) three wells will <br /> needed initially in the right , center and left f unused <br /> areas Sections not being worked) The direction of water <br /> flow 's to be demonstrated. Should there be a contrary <br /> flow indication , there will be a need for additional_ wells. <br /> Mr. Holmes feels in this case, we will need five wells. <br /> . . . . . will not put need in writing, this is a verbal <br /> statement to Mr, Holmes from Mr. Russ s a Lakeville* <br /> Mr. Holmes states that engineering cost will amount to <br /> do $1000.00, cost of -wells Will be extra. The average depth <br /> o. wa er in area under discussion is 50 ft. We reed more <br /> information oxo character of each site. <br /> One well digger reports a cost of $8.00 a foot for <br /> four inch holes. <br /> Ili members were present at the meeting. <br /> Respectfully submitted, <br /> Harriett C. Daly <br /> Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.