My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/7/1982 BOARD OF HEALTH Minutes
>
7/7/1982 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2018 5:07:29 PM
Creation date
3/19/2018 3:16:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
07/07/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Phase IIF <br /> } Phase II involves filling the elongated kettle }joie in the middle <br /> westerly third of the sits Basically the scheme of operation px °sed <br /> i r„ . <br /> tially involves constructing� ars access road the va ey. Tien <br /> 60, wide flat area to be used as an access road, area and area for <br /> socked material is. con5tructed ifith proposed rows of cells used on the <br /> left. GeneraUy the cover maty rialL for one root of cels is taken froin the <br /> adjacent n r h rV row of cels. The rows of celwi 11 be worked from • <br /> the south end northerly. Fi-nally the shy foot wide access area i-n he <br /> used as the locus for two additional coifs of cels+ worked from the north <br /> end souther . The c.ontrac or can al erm ely 1the c s n the' rows <br /> whatever order he des1res. when the final c el .s are completed back to the <br /> v2.c n . the ou herlyt'� �the second , the con-tractor dl : <br /> construct a ramp sufficient -bb drive vehicles up on top of the first's Uft. <br /> The u r ct� i� age the southerly end o the second tier ` <br /> working northerly. The cover m ta]. will be taken from- the next northerly <br /> row 16cation. Again the shy—foot wide area on the east wi-U remaln clear ; <br /> for <br /> vehicular access areas and the stockrdling of coven ma .erial <br /> cla,y and loam in separate des The rows will b .worked south to north <br /> • ace in two roves on the 01 wide open area. <br /> With final <br /> o �1 emend the final rows s out'�h rly o the o the <br /> The con rac r* <br /> Phase Uo The <br /> contractor will then construct a ramp sufficient to drive <br /> vehicles on top o -the completed second tier. The contractor will -then <br /> start � <br /> she brd tier s' the- cel run ir� =ety degrees to the basewe <br /> on C h ar lea. a sixty--footstrip-for access and storage. �na� the <br /> long rows_. 'the. access areas axe used. <br /> The de of the operation are the same as Phase 1. The refuse <br /> Is placed at the botm of the worms face. The reu.se is spread in layers <br />
The URL can be used to link to this page
Your browser does not support the video tag.