My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/27/1986 BOARD OF HEALTH Minutes
>
8/27/1986 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:49:16 PM
Creation date
3/23/2018 1:06:19 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
08/27/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TOWN of MHPEE <br /> BOND of HEALTH MEETING <br /> August 27 , 1986 page 2 - <br /> Memo from DEQE re : 1988 grant program this was noted and <br /> copy to .be give to Weston & Sampson, <br /> Memo from Exec. Sec . re : weighing program at the Landfill <br /> we are to gait until we hear from Mr. Hall and inform him <br /> that we do have a location that would be level for the scales. <br /> Memo from Exec. Sec * reL Otis rail transfer station to be <br /> filed and noted. <br /> 1AHB meeting 9/27/86 no one from Board to attend* <br /> Merano from Exec. Sec. re : status meeting of Ma hpee commons <br /> ons <br /> only library plans have been seen - no one to attend the <br /> meeting. <br /> Variance request for the following locations <br /> 213 Hoophole Road, 158 Pi.necrest Avenue and 72 <br /> Highland Avenue all of these in the moratorium area <br /> cFB motion to give occupancy variance on all three <br /> and to have' disclaimer given and to sign off on <br /> oc cupancy �appl ication after disclaimer had been filed <br /> second. by RLw. <br /> Request for extension of percolation tests on the following <br /> locations <br /> 8 wheelhouse Lame and 80 South sandwich Road <br /> cFB 1 Lw voted to extend' six months on each lication. <br /> Plan to move septic tank and pipe leading to -leaching <br /> was reviewed and Board gave approval told Mr, Lacava that if <br /> the tank broke, cracked while moving than the tank would have <br /> to be replaced by a 1500 gallon tank. cFB RLW <br /> Plan to repair system at 569 Troon Way was reviewed and approved by <br /> the board-- installer to advise off ice when work will begin so <br /> that someone from the office could itnes . FBRLT <br /> Plan to update system at 65 Forest I rive was reviewed and <br /> approved by board. cFB RLW <br /> Variance request for update of system Squaws Lame owner of Lot 4 <br /> to be notified also check- on living space in garage . <br /> 4 <br /> r <br /> eptage plan . for 166 Whippoorwill circle was reviewed and <br /> denied by the board plan , and letter - to go to DEE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.