My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/19/1988 BOARD OF HEALTH Minutes
>
4/19/1988 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:31:18 PM
Creation date
3/23/2018 2:02:41 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
04/19/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GRC-con't No matter what condition it's left in, we have to be ready to take over July, 2. <br /> EV- I hope you hold his bond <br /> JM- Once his cortract is up,. he won't be allowed back on- site. <br /> 49FB- In the past we've had contractor back in to finish the clean-up and grading which was not done* In another <br /> n stance we've taken the rr�oney leftover and paid h inn to finish the work after the contract was up. - <br /> , - Under these c l rrurnstances, where the Town is-taking over, he should not be allowed back on site under any. <br /> circumstances. After Jure 30, he has no insurance, no liability. <br /> FB- We'll check w Verne on what we're holding as assurlty. <br /> GRC- I'd like to find out now before we get any closer to the date. <br /> EV- I want cooperate w/you on the operation. We need your guidance,, we're greenhorns. You' re overseers. I'd <br /> like to keep a copy of the W&s inspection report. Do I need ,your OK tcall W&5 if I have a question? <br /> OFB- Usually when W&5 comes down, they talk to whoever is working at the larJfill and-go over what they've <br /> found as defficiencies. You can talk to thorn then or call Nike 5ci lone with your questions. <br /> EV- Then ist it AS responsibilty to inform us as to the allowed elevations. <br /> OFB- Yes, they tell the operator how far- up he can go and what he needs to do to stay within the limits set by <br /> DBE. We'll make a note to i afore W5 to came down and inspect towards the end of D i Tagg i o contract.They <br /> should came down two weeks before-the end and-at the closing date. They're to set the grades for the new <br /> operator. <br /> GR : - �W ether..or nit DiMa i o has read the contract,, he signed i t, so wfiatever he meds to do to proper l y <br /> close the landfill he'll have to do. F erypart of that contract is enforceable. <br /> EW- I think we should invite him in <br /> J - Yes, as soon as possible. <br /> CFB- The other question is regarding the sale of stickers. We've delayed selling them because we weren't sure <br /> how long we'd be in the landfill business. We've been questioning when they'll be sold and how rrruch -to charge. <br /> # I'm not prepared to respond to that. I know that the Selectmen would like to talk to the BOH about this. <br /> FB- We were th i nk i rig of a half-way increase to abet the pp l e' u sed to the idea that it's not a O i veaway anymore <br /> and then net year change the full amount whatever that'll be. June is a good month to issue, rather that January <br /> when not all the folks are around. i <br /> J4- I don't think the se1ectren will want to sell thEm until July 1 We my issue thein at Town Ball along with <br /> er permits like beach stickers. <br /> FB- Our experience has shown that if we don't affix the stickers to the vehicles ourselves, we get into pro- <br /> blems. <br /> JM- We're not going to have people runn i rig out to put stickers on. <br /> GRC- We will still be issuing the carrrrerc i a l stickers. <br /> FB- At the gate then,,you'd better rake :sure that no vehicle is allowed in without a sticker aff i iced to the car <br /> EV It will be attached and at a location we decid upon. <br /> F - We've been thinking of around $50/yr for the stickers. We thought this year half of that. This should go <br /> into a fund for the operation of the 1 andf i l l. <br /> J4- At $25 there won't be any cushion left over. The Town is still going to have to bear the cost of the <br /> Transfer station. I'm not prepared to give a recamiendat ion on a aumourr the Se l� want to input. <br /> p p g � <br /> EM- The other alternative is for us to stare selling there as in years past, for the same mount. Just to <br /> help you out. If ,you wait until July 1, it'll tape 3 employees just to sell stickers. Whereas we can start now. <br /> GZC- Bid we relinquish our authority as to what to charge for the stickers' <br /> A- At this stage ,your have it unt i 1 June 30, Afterwards you don't. You are then no longer the operational con- <br /> troller of the landfill. You only have regulatory control. I shave the philosophy of the BOH that the residents <br /> should be paying for the cost of the operat i on at the 1 an f i 1 l, that we should rot be giving these st i ckers <br /> away but I'm not sure all elected officials share this view. <br /> ORC- Who now takes control of the land itself at the du p? <br /> JM- I can't give ,you an answer to that because I'm not surge it was ever formally tramsfered to the BOH. <br /> GRC- Why has the BOH been sited then? -It's irriprtant to me because of the Sewer Ccm. <br /> OFB- We'll have to ask Reardon. <br /> G C- I cha l 1 enge the fact that we won't have con tro l -overx the price of the stickers. Would ,your find out <br /> for me. <br /> A- I'll certainly make the inquiry. I'm not sura we'll get a response before June o. . <br /> 41k--Thesticker was nearer a factor in the cost of. operati ori. It as-our means of conto l l i ng #�o enured the <br /> ndfi 11. 1 agree [ even at 50 it not going to come near the cost of runnIM i t. <br /> Right now the BOH has both the operational and the regulatory control over the landfill, carie July 1 <br /> tffe operational control willfbe handed over to the DPW: so Ernie will- be sighted for violations came July 1. <br /> c- Your can handle the whole th i rig then carie July 1. packers, caTnerc l a l haulers a 1 l stickers. <br /> EV- We won't have packers once the Transfer station is built. It'll still be you guys with the problems of <br /> low <br /> le <br /> { r R - <br />
The URL can be used to link to this page
Your browser does not support the video tag.