My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/19/1988 BOARD OF HEALTH Minutes
>
4/19/1988 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:31:18 PM
Creation date
3/23/2018 2:02:41 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
04/19/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� - <br /> K-cont. We are anticipating the strictest discharge permit parameters, thus the.underwater Id's. Design will <br /> r reduce total nitrates to 4ppr . Denitrification thru methonal feed. Disinfecti n thru ultra-violet. Location <br /> of leaching area is flexible. 95000 'sq., Hydrogeo analysis is being finalized now.-Mbnitoring wells are in. <br /> ackgrund samples around River are in. We're not sure at this time which way the groundwater will flow but at the <br /> nticipated location it .will probably flow S.E. away from the Quashnet River. Once the plant is built additional Mn <br /> toning wells will be installed'to check flow di rection.-Them Will. be at least five wells to be monitored at least <br /> on a sn i-annual basis. DEE gave us conceptual approval. b .sed of the fea s ab i l i ty report, We have to do the E 1 R <br /> before getting the discharge permit. BOH DEE witnessed soil tests �n they rea. Good soi1� sandy. <br /> CFB- I recall from our,prev ions discussion,, you've done�ybu hame work you've 1 i stened to our ria nendat ions. <br /> RK- e realize that in ashp the ,stri t� t t r�s for the plant i necessary. <br /> . i <br /> CFB What about the sludge's t, � a�r�aT � � ' k f _ <br /> RK- It'll b co l l e ted in a s l d e holding tank. It will be P24rPed out or"oe Y6&, but probably not for the.first <br /> couple ,years assuming phased dev. Where it's going we don't !know specifically. There,arre a couple of facilities <br /> prop sed. off Cape. These are private. We realize that before we can operate the plant we will need to have a con- <br /> tract for the r mva l.; J * . <br /> Fes-. You need not just a contract with a hauler but also.one with a. approved fac i l it t cce t it. <br /> RK-we understand. A hauler and destination facility. _ <br /> GRC- Don't depent on the Town to provide ,you w a destination* We're looking-into possibly entering into a <br /> contract w/Upper Blackstone but it's a carnpl icated` and lengthy process. Proceed ars.though we aren't. We're- <br /> not <br /> e're-n t going to get caught a second tine. As EAM stated REE requires a contract w/the hauler but not necessarily <br /> w a facility. It will b requ i red f you t .prrov i de a contract w a hauler and a facility, We cannot co rm i t <br /> ourselves to ,you that we will provide an answer-to this problem. <br /> CFB- bst of ray other questions have been answered. I like what I_ see. ,A l a rrns, s 1 udge disposal, output <br /> calculations, disinfectaft process. EIR will indicate the impact. Does anyone have-any further questions. <br /> EA Do ,you foresee using an interim system? ' <br /> RK- It's to soon to tel 1 right now. <br /> AT- Even if we do, we'd size it for the ulitirnate plant and just .chang the ping. We don't want to have to start <br /> the pprocess over w/the planning board. The State is looking at purhaing- a large portion of'the dev., when <br /> 6Qi f they o, we might have to revise our plants ants plans. We'll 1 have a better feel about this i n about ten days.nd <br /> fore any moneys are expended for des i gn rear i e , why don't-we wa it ten days. We have a meet i ng ton i to se lectmen <br /> over other issues, you should have received invitation along cocom. <br /> GRC- We haven't received any such invitations that 1 know of. <br /> RIS- Planning, BCH and CONCOM were supposed to receive invitations, so that everyone would be aware of what's <br /> going on. <br /> GRC- I'ire been asked to leave when you cam before the se l ectrnen before. <br /> 1K- you should be theme and ,you are hereby invited. <br /> CFB- Let's go to #18 on the Agenda and take 3-17 home to peruse since they are mostly inforrnational. <br /> 4 <br /> 18. Plans, proposed Treatment P l ant, Cranberry Hollow,. CFB- Deo they have theme permits? GRC asked that EM find out <br /> what the rev i s ions are and present then to the Board at a- 1 aster.meet i n <br /> 19. Plans, Interim Septic System, Willowbend/Fox Run. Escrow has been set up. Has been discussed Planning and C - <br /> tu it Water. No cast frcrn DEE yet. GRC- concerned wCotu it water. Wants to make sure a l 1 i nvo l iced are satisfied.. <br /> Ask for cent from Planning ConCmCotu it Water/Water Corrm. Once i nfom ed and DEE approval,, then OK to issue <br /> interim at $50. (fpll charge vyhen Plant application is apprroved.G C- we should establish this policy of informing <br /> other~ depts. in spite of the fact that they don't all always inform us.I don't like then coming in here for <br /> a treat'nent plant approval, then turn around and cane back wean interim system. ,CFB- as long as they use the same <br /> leaching area as p l anned for the treatemnt p 1 ant.GR - These peolple are the ones holding back for the reg i ona l <br /> p 1 ant. They've sunk money into researcg for the regional. CnOm isn't i nvo 1 ved because we haven;t rye i ed the <br /> E l R, their concerns are addre s sed in the E 1 R.- l earn it w Fuda l a and find out fr rn him who else should be asked <br /> for carrnent. <br /> O. Plan, lot 1, Route 130, Chaprnan.re: systn grease trap, originally not on plan. Plans were changed a per our <br /> request. They did not i nd i c ate a need for a GT, Send copy of reg r*e: f. OK to put in EAM- the well can only a cc m <br /> Odate 24 people, so the idea of a small restaurant or coffee shop is out of the questrion. They'll still have to <br /> cane in for a permit for food sear i ce. Send letter i nd i cat i ng well capacity. but atherwise Ok to i n star l 1 GT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.