B 0 A R D o f H E A L T H
<br /> E N D
<br /> DATE . MAY 1 , 1988
<br /> I
<br /> A P P . I N T M E N T S
<br /> NAME TIME REGARDING
<br /> E* VIRGILIO - D.P.W. 3:30 LANDFILL/TRANSFER STATION
<br /> CHARLOTTE STEIFFEL 4:00 UNDERGROUND STORAGE TANKS
<br /> 1. SIS WARRANTS
<br /> 2, APPROVE MINUTES, MAY9, 1988 MEETING
<br /> I
<br /> 3, ADMINISTRATIVE ORDER, DEE RE: BEPTAE AND GREASE DISPOSAL
<br /> 4. COPY, HOUSE BILL 5426 RE: REGULATION OF SELL TREATMENT PLANTS - FYI
<br /> . COPY, DEPT. OF PUBLIC HEALTH RE: PRIVACY OF MEDICAL FILES
<br /> * COPY, M1i0A MINUTES 4/24/88 - FYI
<br /> 7* COPY, DATER CONTROL LAB TO B.J. RE: VOC TESTING
<br /> 8, COPY, WATER TREATMENT GIDE FILTRATION SYSTEMS) - FYI
<br /> Copy, Barnstable county health dept.: open water and pool water testing schedule
<br /> 10. COPD, AUTHORIZATION TO BORROW $278000 FOR TRANSFER STATION
<br /> 11, ANNOUNCMff, CONFERENCE ON RECYCLING AND C vPOSTING, 6/8/88 AT C*C.C.O,,
<br /> 12. , NEWSLETTER M*B - FYI
<br /> 13. COMPLAINT, LEE B. DANZZ, RE: ACC MLATED DUMPING ARE DRIVE/ ALMA ROAD
<br /> 14, REMISED SEPTIC PLANS, CHRIST THE DING CHURCH
<br /> 15. SEPTIC INSPECTION, ARCO FOR CAFFYN (REQUEST TO CONSTRUCT FULL FOUNDATION W/O TITLE V SYSTEM}
<br /> 16. PLAN, EPAIR UP ADE SEPTIC SYSTEM, GERRY LABUTE, FOR SHELL STATION, ROUTE 151
<br /> 17, PLAN, REPAIR SEPTIC SYSTEM, CARLTON HENDRICKS FOR UNITED CHURCH VILLAGE 9 1 HIA COOMBS WAY (ADDING 2ND PIT)
<br /> 18., PLAN, RE-PAIR/UPGRADE SEPTIC SYSTEM,, CA LTON HENDRICKS FOR TERRY HORNICI ,- 113 SHIPWRECK DRIVE
<br /> 19. PLAN, EMERGENCY FAIR SEPTIC SYSTEM, B.S*C. FOR R. BRIEN,, 48 [UNCLE HENRY'S ROAD TITLE V VARIANCES REQ.
<br /> 0, PRELIMINARY SUBDIVISION SITE INSPECTION RECUq4] DATION RACSEY/MlARSTERS M411 ,17A & M40/L20 =84 LOTS)
<br /> 21. PRELIMINARY SUBDIVISION PLAN '.'GREENBRIER AT HOLLOW RAD", LEVY, ELDRID E&WAG ER, MAM LOTS 15&16 17LOTS
<br /> 22. PREL IM I NARY SUBDIVISION PLAN,,HOLMES&MCGRATH FOR EARL M I LLS 9 LOTS)
<br /> 3. PRELIMINARY SUBDIVISION PLAN, HOBS VEGRATH FOR M. MACDONALD 18LOTS
<br /> 24. PRELIMINARY SUBDIVISION PLAN,, HOLMES&KGRATH FOR ANGUS/ROBII N 7 LOTS)
<br /> 25. REVISED INTERIM SEWAGE DISPOSAL SYSTEM - STRATFORD PONDS
<br /> Ilk. JURY DUTY,, EAM STARTING G S/17/88
<br /> 27* LAURA SAVES, SIX VUM PROBATIONARY PERF OVER (BENEFITS RETROACTIVE? PAY INCREASE)
<br />
|