My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/27/1990 BOARD OF HEALTH Minutes
>
09/27/1990 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:53:39 PM
Creation date
3/23/2018 3:03:04 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
09/27/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�l <br /> �i <br /> TOWN OF MASHEF <br /> BOARD OF HEALTH <br /> September 27, 1990 <br /> Meeting called to order at 7:00 p.m►. <br /> Members present; Stephen J. Greelish, John T. Doherty and <br /> George R, costa <br /> THE TAPE 1S NOT FART OF THE MEETING IT IS FOR TRANSCRIPTION <br /> TION <br /> PURPOSES ONLY <br /> Mr. Stephen J. Greelish, Chairman <br /> i 1 . Warrants signed <br /> 2 . Mr,, costa motioned to accept the* minutes of September <br /> o , 1990 , Mr. Doherty seconded, all agreed. <br /> . Memo from Exec, Sec. to chairman re: School_ trash - <br /> Mr. Greelish st ted4,he will speak with Mr. Harrington regard- <br /> ing this issue. * <br /> . Memo from Truro Selectmen re: SEMA S trailer was - <br /> Acknowledged <br /> i <br /> 5, ) <br /> V, ress release re. Oct, 17 1990 talk - Acknowl- <br /> edged <br /> i <br /> . Janes Circle Trust 21E re ort and water supply cost es.-� <br /> timates - Mr. McQuaid informed the Board $32 , 300,00 has been <br /> estimated for the installation of 23 private wells. Town wa- <br /> ter was estimated between $17,800 .00 and $27 ,800. 00 higher <br /> than costs for private well installation. <br /> Mr, Greelish commented costs are unsubstantiated and <br /> ill require formal estimate from the water commissioners. <br /> Mr, McQuaid was directed to inform the developer that a for- <br /> al. estimate will be required. <br /> Mr. Greelish read the following "Conclusion" of the re� <br /> port as follows: Based on our inspection and research into <br /> the Site, A.M. Nilson Associates, Inc. is of the, professional <br /> opinion that, to the best of its professional knowledge, in- <br /> formation and belief at the time of the visual inspections, <br /> no visual , physical. , chemical or historical evidence was en- <br /> countered which would indicate that a release of oil or haz- <br /> ardous <br /> a -arFdous material has occurred at the Site ih recent history. <br /> The Site conditions do not qualify as a "Suiper Fund <br />
The URL can be used to link to this page
Your browser does not support the video tag.