' r <br /> Mr. Doherty replied that he would amend his notion to reflect. The motion is to <br /> rescind the order to sign the certificate of compliance and direct agent to rescind <br /> letter. Mr. Santos seconded this motion. Motion passed. <br /> Mr. Labute stated that hewasn't as upset with the BOH department as he was <br /> with the building department. The building department said that they were going <br /> to fine Mr. Kerrigan. He waited and gaited without any action being taken.-Then <br /> Mr. wheeler turned around and told him that he was going to go after Mr. <br /> errigan's building license. Mr. Labute asked Mr. wheeler what good was that <br /> going to do. Mir. Kerrigan told him that he was going to retire and go to Florida by <br /> selling this house. That was why he was going to get everything all done. <br /> Mr. I herty asked r. L bute for one more thing. He asl ed him to put the history <br /> f these events in writing. The reason being is that if the BOH is going move for an <br /> enforcement action. The BOH is going to have to have in writing from him that he <br /> did not complete this system. He was going to ask J R Sales to do the same <br /> thing. <br /> APPOINTMENT: 128 Uncle Peru's load <br /> Mr. Carmen Shay from Shay Environmental Services was present representing the <br /> applicant, Mrs. Germaine Young of 128 Uncle rer's Road. The types f variances <br /> being requested are as follows: 1. A reduction in the distance from the proposed <br /> SAS from 20'from the concrete foundation to 10". 2. A van*anee is requested to <br /> allow the use of the Micro-Fast 0.5 System (Remedial [ase). 3. A variance i <br /> requested to install the SAS within 100'of the existing wetlands {751 and vernal <br /> pool 21. A UV lamp is proposed for virus removal. 4. A variance is requested to <br /> use the Micro-Fast 0.5 System to reduce the separation from the bottom of the SAS <br /> to observed groundwater (mottling) from five feet to three feet (2 foot reduction). 5. <br /> variance is requested to install the SAS within a Flood Zone -13 of Land Subject <br /> to Coastal Storm Flooding. 6. A variance is requested to use a soil sieve analyses in <br /> lieu of a perk test.. Due to the presence of high groundwater at the site a <br /> conventional perk test could not be performed. <br /> . Shay began by stating that he was designing a new system and there were a lot <br /> of complications relative to size constraints and resource protection. They have <br /> wetlands to the left and rear, which are all very proximal to the lot lures and the <br /> site. There is only one good place to put the system, which is where it is sited. He <br /> is installing a Miro-Fast System that is designed for three-bedrooms. <br /> Mr. Harrington joined the conversation and begat by stating that the current plans <br /> in front of the BOH members were revised plans. Mr. Sherman of the Conservation <br /> Commission had a question regarding the wetland line for BVW. That has been <br /> revised. <br /> Mr. Shay stated that he had originally had the BV iT probably where the BOH <br /> members were viewing the 9 5 contours or just a little beyond that. Mr. Sherman <br /> went out with Mr. Shay to the site and agreed upon where the lime would be. It is <br /> 'probably a little bit conservative. <br /> 12 <br />