Laserfiche WebLink
i <br /> Mr. Santos asked if the BOLI had already approved this once without the <br /> denitrification system. <br /> Mr. Harrington replied that they hadn't approved it with the denitrification <br /> system. He felt that a revised plan was necessary lir this matter. <br /> Ilr. Ball suggested that they approve it. Then have them submit a revised <br /> plan with Mr. Harrington's review and approval.-Rather than have therm <br /> have to come back again. <br /> Mr, Harrington replied that the lot was 16,000 square feet with the <br /> denitrification system. He asked Mr. Ojala what type-of technology h <br /> was going to use. <br /> Mr, Oiala stated that he would be using either the FAST or Bioclere. <br /> Mr. Harrington continued by stating that both are approved for <br /> provisional use. DEP would have to see it. 'Therefore, the DEP would have <br /> to be a condition of approval. They would have to wait for a. response <br /> from the DEP upon a review of a revised plan. <br /> Mr. Ball made a motion to approve the following variances: a A 421 <br /> setback from the proposed well to the leaching facility, b ' setback <br /> from the closest abutting well to the proposed primary leaching facility. <br /> The approval of the variances is contingent upon receipt of ar revised <br /> plan, which will include the installation of ar denitrification system for <br /> provisional use along with DEP submission and approval. The BOH <br /> members have given IIIb. Harrington the authority to review and approve <br /> the revised plan without benefit of re-submission to the BOH members. <br /> Ms. Grady seconded the motion, Motion passed. <br /> . Emergency Repair Certifications: <br /> 28 North Vl�a <br /> Ms. Warden indicated that the leach pit was full into the riser. The <br /> original intent was to have homeowner obtain engineered plans due to <br /> the paper roach and an easement. However, the original engineer on the <br /> septic dens provided a sketch for the repair of the system. Ms. Warden <br /> approved it. <br /> The board members forwarded their signatures to the Emergency Repair <br /> Certification Foam. <br /> 107 Fells Porro! Road <br /> Mr. Harrington indicated that the pit had failed flue to structural integrity. <br /> 1 <br />