Laserfiche WebLink
z � <br /> Hiacoomes circle <br /> Mr. Harrington indicated that the leach pit was full to the top. It is a four. <br /> bedroom dwelling. The intent is to install three 500-gallon chambers with <br /> ' of stone and a 33.5' x 13' x 21 [each trench. <br /> i <br /> The board members forwarded their signature to the emergency <br /> certification form. <br /> g Forest Road <br /> Ir. Harrington and Ms. Warden both indicated that the septic was located <br /> off of the property. The upgrade will bring this property into compliance. <br /> The board members forwarded their signature to the emergency <br /> certification form. <br /> 110 old Creat Neck Road <br /> Ms. Warden indicated that the cesspool was overflowing onto ground <br /> surface. The intent is to require engineered plans due to the soil <br /> conditions, groundwater, and abutting wells and lot line variances. <br /> The board members forwarded their signature to the emergency <br /> certification formm <br /> Request for reduction in I/A system test!nq__requir encs - _�qu striaMn <br /> Avenue. (continued from the previous meeting.} <br /> Mr. Miller, homeowner, was present for#his meeting. He began by stating <br /> that he had.-met with the board informally last spring to the best of his <br /> recollection. He had requested a waiver for the second year of the two- <br /> year requirement for the nitrogen testing. They had been living in this new <br /> residence for approximately a year. It is a year round residence. The <br /> sense he had gotten from the board at the previous meeting was that they <br /> would probably review his request favorably pending the fourth <br /> completion of the first year of testing, which at that point has not be <br /> completed. He administratively followed up after the completion of the <br /> fourth test in the hopes that the board would reconsider the second year <br /> of testing. As it happens that was not the case. He was unable to attend <br /> the November 14th; 2002, He apologized for not being at the meeting. He <br /> gathered that the criteria had to do with manifest injustice and equal <br /> environmental protection, The in justice was largely economic. At $160,00 <br /> per quarter per test, is in addition to the ongoing quarterly maintenance <br /> that is contracted through the company, It still needs to be pumped <br /> periodically and of course, they are paying a fair amount for the water that <br /> goes into the system in the first place. The technology was all neve to <br /> them when they bought the house. They didn't even recognize the <br /> economic ramifications of it until after they were there for a while. 'then <br /> they cane around to do the contracting for the services. just as a matter <br />