My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/23/2003 BOARD OF HEALTH Minutes
>
1/23/2003 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:03:49 PM
Creation date
3/26/2018 1:50:36 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
01/23/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
until they could determine exactly what the status of the sewer <br /> extension, He would like to tie this in somehow,, But, again they were late <br /> in the game here. They had a lot of other buildings already approved. <br /> There has been other precedents set. The board has allowed, signed off <br /> on and built* They were down to the fast two. He wished he had been here <br /> earlier to make other recommendations. <br /> Mr, Ball asked if Mr. Harrington wanted some more time. <br /> Mr, Harrington responded that he wanted to find out exactly whet the <br /> status of the sewer extension was. He thought that had been at least <br /> applied to the DEP. It should at least be in the DEP's hands. Ultimately is <br /> this septic tank going to impact anybody? He didn't believe that it would. <br /> But, because the variance is requested. The board gets to take their shots <br /> at it. <br /> Ms. Warden added that she knew that with the other homes the board <br /> granted the variances with the stipulations that they would tie-in within <br /> two years, she did remember that. It is going to be difficult to get the <br /> homeowners to adhere to it after the home is built and the septic system <br /> is in place. <br /> Mr. Harrington asked Nis. Warden if there was a timeline set for the <br /> approval of those permits. <br /> i <br /> Ms. Warden responded that there was and it was for them to be tied in <br /> within two years for the sewer lines. <br /> Mr, Harrington stated that he was unaware of that condition. <br /> Ms. Warden asked Mr, Grotzke if he remembered that condition. <br /> Mr. Grotzke replied that he did not remember that. <br /> IIIb. Harrington added that they should be acting on that, <br /> Mr. Ball added that there was the time frame right there. <br /> Ms, Grady asked if it was within two years of the installation of the sewer <br /> itself. <br /> i <br /> Mr. Ball responded that it was within two years of the approval of the <br /> permit. <br /> Mr. Harrington added that it would have to be within sixty or ninety days <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.