My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/21/2003 BOARD OF HEALTH Minutes
>
8/21/2003 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:48:59 PM
Creation date
3/26/2018 1:59:32 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
08/21/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
equipment, Then it was forgotten about. <br /> Mr. Harrington replied that they had settled that problem with volunteers. <br /> Vis. Warden noted that Mr. Ball and Mr. Doherty were adamant that they <br /> did not want it on television. <br /> IVIS. Grady asked why since it was a public meeting anays. <br /> Mr. Santos couldn't recall that they had a problem with it. He knew Mr. <br /> Ball didn't want to do it. <br /> IVIS. Grady asked if they would have to go up there. <br /> IVIr. Harrington stated that everything would be brought downstairs. <br /> Ms. Carron asked if there were two concurrent meetings would there be <br /> two sets of equipment. <br /> Mr. Harrington didn't know hew they would handle this. <br /> Ms. Warden reminded the board members that it was the board's option. <br /> Ms. Grady stated that if this were closed meeting it would bother her. <br /> However, since it was net then it might be of service to the publici. <br /> Mr. Santos felt that they couldn't make a decision without a full board. <br /> Mr. Harrington Mated that they did net intend to have this done until <br /> September some time. <br /> IVIS. Grady continued this item until the nett meeting, <br /> C, Septic installation Inspections by-BOH <br /> Mr. Harrington began by stating that about a month ago he had thought to <br /> bring this before the board at the last meeting, This 228 Wading Place has <br /> played right into this as far as the board of health doing the final septic <br /> installation. This would be new installations versus just emergency and <br /> would encompass all installations. There are two sides of liability that he <br /> felt the town should be aware of. The first is that Title V, 310 CMR 15,02B, <br /> states that the approving authority is supposed to make sufficient <br /> inspection. Then tell the contractor that they could backfill. They were <br /> not supposed to backfill until the board gave therm the okay. The installer <br /> and engineer were supposed to sign the certificate of compliance on the <br /> application or a so called approved form by DEP. The as-built cards are we <br />
The URL can be used to link to this page
Your browser does not support the video tag.