Laserfiche WebLink
Ms. Grady didn't want there to let somebody do something or let <br /> somebody else do it. <br /> Mr. Harrington felt that the other times that they encountered this <br /> situation was that the properties were in Zone 11, They weren't In zone 11 <br /> here. , <br /> Mr. Santos was in agreement with there being no large storage of <br /> pesticides or any type of hazardous waste. He was going to have to cone <br /> up with more of a detailed design regarding containment and anything <br /> related to that topic. Another thing that jumps out at him there was no <br /> subsurface in the drainage swales. That was something that the board <br /> has always required. He didn't know if they should refuse this new and <br /> have there re-submit revised plans with the appropriate details and <br /> information, or did they want to make an amendment that... <br /> Mr. Harrington interjected that subsurface structures be added to the <br /> drainage swales. <br /> Mr. Santos agreed that that was correct. Usually when they see these <br /> types of plans they were preliminary. Then they come in with the revised. <br /> Those were the two policies that they board stuck too. They didn't want <br /> to be creating mosquito nesting ponds, When he was speaking to an <br /> engineer today. One of the primary reason he used them was that down <br /> here with frozen ground. There was a place for water to drain out of and <br /> that was a very good point, That was why a lot of water design engineers <br /> use there. If the ground was frozen where was the grater going to go. <br /> Mr. Harrington continued that as far as the hazardous material <br /> storage...only and set a limit as far as what they could store. <br /> Mr. Santos re-iterated that subsurface drainage and swales condition. Did <br /> they need that into a motion <br /> Ms. Warden asked if they needed revised plans? <br /> Mr. Santos confirmed that that was correct. <br /> Mr. Santos made a motion to continue this agenda item until the <br /> hazardous materials storage, subsurface drainage and swales were <br /> addressed on the engineering planso <br /> Mr. Harrington asked if the board wanted hire to resolve the issue or <br /> research it as far a .,,He knew that the fire department had limits on wham <br /> they could store and also he wanted to speak with Mr. Maffei and confirm <br />