My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/25/2003 BOARD OF HEALTH Minutes
>
9/25/2003 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:53:35 PM
Creation date
3/26/2018 2:01:02 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
09/25/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
T <br /> S <br /> TONIN of MA HPEE <br /> BOARD of HEALTH <br /> September 2511, 2003 <br /> Mr. Ball opened the meeting at :01 PMe <br /> THE TAPE IS NOT PART of THE MEETING: IT IS FOR THE PURPOSE of <br /> TFtANSCRIPTION ONLY. <br /> Members Present: Steven R. Ball, L. Glenn Santos, Glen E. Harrington and <br /> Veronica A. Warden. <br /> NEW BUSINESS <br /> 1. Si n warrants. <br /> Warrants signed, <br /> 2. Approve minutes of March 2 t''* 2003, April 7 �'' 2003, April 24��1 2003 and 4 <br /> MayM;ly 'I Sth12003 <br /> The approval of the minutes was deferred until a full board was present. <br /> Variance Request- Septic, cape & islands Eng. Representing 1Hinigret <br /> Avenue <br /> Mr. Harrington began by stating that there was an initial submittal to the <br /> department. He did a review and advised Cape & Islands that they notify <br /> the abutters. He requested that they put elevations on HBD because of <br /> the elevation of the pend. He wanted to tie in the elevation of the pond <br /> and use that as some tie to groundwater, They determined a highest pend <br /> elevation. Mr. Sanicki completed those requests, one of the abutters is <br /> here. He wanted Mr. Sanicki to do the technical aspects of the system. <br /> Mr. Sanicki was present from cape & Islands representing the applicants <br /> for 190 Ninigret Avenue. He began by stating that they had a small 7,958 <br /> square foot lot. This was a pre-exciting three-bedroom house. This part <br /> was on a slab and the other part was on a crawl space type of situation. <br /> Dight outside the door was the cesspool. They dug a test hole in the drive <br /> and in the lawn. They found groundwater at g down, He designed it <br /> based on the groundwater here and it's proximity to the pond. They <br /> brought Mr. Herrington in and he recommended that they bring all of these <br /> elevations down on the N BD. They did. They adjusted the groundwater <br /> about one half a foot, He adjusted another half of a foot and it put <br /> everything out of the ground. Because of the forty inches to groundwater, <br /> plus another six-inch adjustment they were thirty-four inches below grade <br /> to groundwater. He has to do the bottom of the system at five-feet. He had <br /> a mounded system, He was proposing a concrete containment structure, <br /> Waterproof the interior and a30-mil liner on the interior. <br />
The URL can be used to link to this page
Your browser does not support the video tag.