My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/30/2004 BOARD OF HEALTH Minutes
>
9/30/2004 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:54:59 PM
Creation date
3/26/2018 2:39:48 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
09/30/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
unforeseen problems. He would make a motion with those conditions. <br /> Ms. Grady asked if he had to have the food at certain temperatures etc. She was in <br /> agreement with the ServSafe certification regardless of whether it was required or <br /> not. <br /> Mr. Santos made a motion to approve the request for a food establishment permit <br /> application for."'Checkers" owned by Mr. Santangelo. This approval has the <br /> following conditions. He needed to have a ServSafe certification, sanitier with a <br /> fully functioning sink at all times. IVIS. Grady seconded the motion. Motion passed. <br /> APPOINTMENT: Cape& Islands Engineering— Sheffield Place <br /> request to continue this agenda item'was made by Cape &Islands nglneeng. <br /> . Violation of Title V and Local IIA Monitoring Requirement-. 2 Point Road <br /> Mr. Harrington began by stating that back at the beginning of August they seat Mr. <br /> Eric Benway a letter stating that he was in violation of not having an o & M <br /> program for his IIA system at 2 Point Toad. He was given occupancy because the <br /> board had received the contract with Waste-Water Treatment Services. Then in <br /> October of 2003 Waste water-Treatment Services notified them that there was never <br /> any start-up on the denitrification unit and a wiring problem along with broken <br /> piping. They couldn't get to any of the covers because of landscaping. To the hest of <br /> his knowledge this property was occupied. The board asked him to come before the <br /> board'and they did not hear from him. Mt. enw received the mote with a dated <br /> delivery of August 1 ', 2004. <br /> Mr. Santos made a motion to notify Mr. Benway, homeowner of2 Point Road, that <br /> he was to cone into compliance with the appropriate repairs and o &M agreement. <br /> He was also to appear before the board within fourteen clays ofreceipt of the <br /> certified letter. If he did not comply with this order he would be subjected to no less <br /> than $15.00 and n more than $300.00'per day.for each Title V and Deal by-law <br /> violation. Ms. Grady seconded the notion. Motion passed. <br /> . Title V Variance Request—38 Clover Lane Cape & Islands Engineering <br /> Mr. Harrington began by stating that this address was the abutter to 40 Uncle- <br /> Henry's, which they had addressed at previous meetings. This system was deemed a <br /> failure because of it sitting in groundwater. Mr. Sanicki was looking for a variance <br /> of one-foot from the distance between the SAS and high groundwater. The septic <br /> tank pump chamber will be 5' off the property line. This address had the same <br /> problems as 40 Uncle Henry's. He recommended the approval of this upgrade and <br /> attendant variances. They would have to eventually deal with the catch basin issue <br /> for the entire subdivision because they were not being maintained. These properties <br /> were in a flood zone, a high groundwater table and they were similar variances that <br /> were offered for 40 Uncle Henry's. <br /> Mr. Santos did not have a problem with this request. However, he did not see the <br />
The URL can be used to link to this page
Your browser does not support the video tag.