My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/20/2005 BOARD OF HEALTH Minutes
>
01/20/2005 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:04:02 PM
Creation date
3/26/2018 2:48:51 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
01/20/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> Ms. Grady stated that that was correct. <br /> Mr. Harrington stated that that was applicable to Building D. <br /> Mr. Ball was looking at it using the whole complex. After therm no one came in after <br /> therm with five seats here and four seats there. <br /> Mr. Harrington confirmed that there mere no other increases. Before, you would-have <br /> to go back to Carbo's in 1996. That was for the entire build-out because it was <br /> approved as office and retail. When it was changed to the deli market. It was a 2400 <br /> square foot addition thatwasn't actually completed until 1997. But, it was permitted <br /> in 1995 and 1996. That was the December 22nd3 1995 decision by the hoard to open <br /> up the diverter valve. It event downhill from there because there wasn't enough <br /> capacity to add that 2400 square foot even the office and retail never mind a 58 to 0- <br /> seat restaurant. You were going from 150 GPD to 2200 GPD. <br /> Mr. Dalton stated that in 1996 the whole complex was actually increased by 25%. <br /> Building E was built-then, too. They expanded Building A, which was in fact % of <br /> the whole area. Thea they put in Building B, which was 14% of the whole area. <br /> Neither of those existed even before. <br /> Mr. Harrington stated that some-other items that he had run into 1n his review were <br /> also that the septic system, two of the four leaching pits in Building A had failed. So <br /> they could address the Building A system soup to nuts. That was something else they <br /> needed to discuss. That whole system needed to be upgraded not just to have the <br /> septic tanks and the denitrification retrofitted. That was going to be right through the <br /> leaching because the reserve areas were no-longer in compliance. <br /> Mr. Dalton stated that if in fact they were able to go to the DEP. They had tried to <br /> communicate with therm. If a variance cane from this board to allow the existing <br /> seating arra the IEP was willing to approve that. would that be acceptable to the <br /> board? <br /> Ms. Grady asked Mr. Harrington if he hadn't already said that in other discussions <br /> with the DEP. They were adamant about not entertaining airy increases. <br /> Ir. Santos stated that they had tried talking to the DEP. <br /> Mr. Dalton interjected that they wanted to give it one last shot. <br /> Mr. Ri hardi thought that they might have a shot. They will know on Tuesday. <br /> Mr. Harrington stated that it was up to the board. <br /> Mr. Ball stated that these tight tanks would have made it all go away- <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.