My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/17/2005 BOARD OF HEALTH Minutes
>
02/17/2005 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:20:48 PM
Creation date
3/26/2018 2:51:17 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
02/17/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
would like that made into a rrtin for the board to vote on. He was referring to the <br /> never architectural plans, change in tenancy and other things that they had done for <br /> other commercial properties that he would like worked into a final vote. He didn't <br /> really want to do that on his review. He' would like the board to do that. <br /> Mr. Santos stated that they would have to get it all buttoned up and done here. It <br /> would then go up to the DEP for however long they would take. They would like t <br /> get it done as soon as they could. But, they all understood that during the summer <br /> months every establishment would like to be busy and didn't want to turn people <br /> away because they didn't have enough room to park. He was sure that Mr. McGrath <br /> wouldn't want to get a contractor out there and Tuve to drive around a whole bunch <br /> f parked cars. They would want to do it in the slow months, to speak. <br /> Mr. Dalton asked if Mr. McGrath had an idea how long the construction would be <br /> for the scope of this work. <br /> Mr. Santos asked Mr. McGrath if he had any idea. <br /> Mr. McGrath thought that it would be at least three-months. He assumed that they <br /> would run into a lot of utilities because every excavator stated to him that they did <br /> not know here any ofthe tilities were located. So he would throve in ars extra <br /> month because ofthat issue. <br /> Mr. Ball re-iterated that whatthey needed from him and his clients was that if they <br /> did or didn't agree, they needed a set ofplans and septic reports from Mr. McGrath <br /> for Buildings A and I . Then they could move on from there. <br /> Mr. Brady re-iterated that they were talking about the gross flows still not about the <br /> individual units. <br /> Mr. Ball re-iterated the gross flows... <br /> Mr. Brady stated that what they had really done was cut % on Subway and <br /> M shpee Bagel. But, they had not cut % on Gi vann, s, which was... <br /> Mr. Ball stated that the only reason why they did that was because they were the last <br /> ores in and the first ones out. That was the way they looked at it. They were over the <br /> flows, not knowing they were over flows. If they had to go that way. They would cut <br /> the Subway and the Mashpee Bagel Shop and then they would go right into <br /> Giova nnl's. They were the last one's in the mix. <br /> Mr. Brady asked if they were considering Gi vanni's as a new operation under new <br /> management ent n w. <br /> Mr. Ball responded that they were not considering it a new operation. They were <br /> taking the flows that they had. They actually cut the flows hack on the seating. it <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.