Laserfiche WebLink
they were all just one page so she handed them out to everybody so they could see <br /> everything <br /> Mr. Harrington stated that if that was the case he did have some comments. Did this <br /> go to site plan review? <br /> Ms. warden asked what the proposal was. <br /> Mr. Harrington stated that it was 78 Industrial Drive. <br /> Ms. Warden understood that but what was it going to be? <br /> Mr. Harrington re lied that they looked lite contractors hays. He didn't even know. <br /> He had no idea what they were going to he. <br /> 1r. Ball and lir. Santos were discussing the catch basin situation. <br /> Mr. Harrington stated that these were 500-gallon drywells. <br /> Mr. Santos stated that they had the typical leaching basins. <br /> Mr. Harrington stated that they were still only looping for 540 GPD of flow. <br /> Mr. Ball suggested that they let them go with. what they may he thinking of now <br /> and later usage-might he two different things. <br /> Mr. Harrington asked what the land area was. <br /> Mr. Ball stated that it was 73, 568 square feet. He asked Mr. Harrington what his <br /> other concerns were regarding this plan. This was not in Zone II. <br /> Ms. Garron stated that most of Industrial Drive was in Zone II if not all of it. <br /> Mr. Harrington asked how they could he proposing over 1100 GPD thea. <br /> Ms. warden countered that it was 73,000+ square feet. <br /> Mr. Harrington stated that that would only allow 809 GPD. <br /> Mr. Santos-interjected that it was obvious that their hadn't had a chance to do a <br /> thorough review of this plan. <br /> Mr. Ball made a emotion to continue this agenda item because there hadn't been <br /> thorough review of the plans. Mr. Santos seconded the motion. Motion passed. <br /> Mr. Harrington continued that they were asking for 540 GPD and they were <br /> providing a denitrification system'. were they using ng a FAST system`IIf they wanted <br /> 2 <br />