Laserfiche WebLink
Mr. Harrington agreed with Mr. McGrath and added that there was no other <br /> description available. <br /> Mr. McGrath agreed that there was no other description but he added that they <br /> wrote, "passes". If they looped at the checklist that was on page 4 of l l he listed all <br /> as 44no", which meant that the system passed in his opinion. <br /> Mr. Harrington stated that he did the same thing for the other building too. <br /> Mr. Ball stated that as far as Building B, Mr. Brady,.the OAR system would have to <br /> .be installed. They won't address Buildings C and E at this time. They could do this <br /> at a later date. other than the concerns on A& D regarding the failures, they would <br /> need reports from Mr. McGrath passing those systems. That was the hest they could <br /> do for flows that kept them under 10,000 GPD. <br /> Mr. Brady asked if Mr. Ball was referring to the total flows. He thought that no <br /> that they were under 10,000 CPD they could move forward. <br /> Mr. Ball continued with re-stating that as fair as Bui <br />