Laserfiche WebLink
5� <br /> . Landfill Contract Review of FY 2007 contracts(continued from 6121106). <br /> Glen Harrington reported that all three contract proposals have been received in their final form. <br /> Horsley Witten resubmitted a complete RFP including a copy of their annual report. The Horsley <br /> Witten proposal is the least expensive, at a total cost of$17,316.00. Glen Harrington stated that <br /> he investigated as to whether there was a post closure requirement for receipt of an annual or a <br /> bi-annual report and found that there was not. Glenn stated that he is comfortable that Horsley <br /> Witten will do a goad job. <br /> Glenn Santos moved that the BOH accept the proposal from Horsley Witten for the Fly 2007 for <br /> the monitoring of the Ashes Path Landfill. Lucy Burton seconded the motion. All approved. ' <br /> Glen Harrington will check with Joyoe Mason to determine whether she is the person responsible <br /> for the signing of the contract. <br /> S. Commercial site Pian Review&Approval: Mashpee Free Clinic. <br /> Timothy Santos, Vice Pr sldent�with Holmes&McGrath: introduced himself as representing the <br /> applicant cape Cod Free Clinic located at 32 Commercial Street in llashpee. The clinic will have <br /> approximately 9,500 square feet and will have 5 doctors and 2 dentists. The project will include <br /> construction of a building, a parking lot: grading, drainage as well as a septic system. Mr. Santos <br /> is proposing a denitrification septic system called a Ruck l FT. The system Will be monitored for <br /> 18 months, and after 18 months will be monitored quarterly thereafter. Taal flow will be 1650 <br /> gallons per day. <br /> Glen Harrington noted that the denitrification trenches are set up close together, and was worried <br /> about possible overflow. The recommendation was to amend the plan to have one additional foot <br /> between the trenches, mating a 3 foot space between each trench. <br /> Lucy Burton made a motion to approve the grading, drainage and utilities septic plan for the cape <br /> Cod Free Clinic as presented by Holmes&McGrath, with the condition that there be a three foot <br /> separation between each of the trenches. Glean Santos seconded the motion. All approved. <br /> 6. Request for Waiver of Temporary Food Permit Fee: sherry Bergeron,Artisans Fair <br /> After the Board's discussion of the food items to be handled by Sherry Bergeron at the Artisans <br /> Fair, it was determined that a temporary food permit was not required, and therefore there was no <br /> need for wanner of a temporary food permit fee. <br /> Glean Santos made a motion to deny the request by Sherry Bergeron for the Artisans Fair, for <br /> waiver of the temporary food permit fee, because the-temporary food permit was not necessary. <br /> Steven Ball seconded the motion. All approved. <br /> T, Request uest for BOH Re Housing Inspection— 5 Cayuga Avenue <br /> Glen Harrington stated that as a result of receipt of a complaint, he conducted an inspection at 25 <br /> Cayuga Avenue The complaint vas that there was the belief that too many.people were living <br /> there due to the number of oars that were regularly parked there, and the amount of noise <br /> emanating from the house at late night parties. When Glen Harrington went to the house f6r <br /> inspection: the owner was there and allowed hire into the house. .The house hes three bedrooms <br /> upstairs and also three bedrooms added in the basement. The property is assessed for three <br /> bedrooms only. Glen surmised that the current owner of the property is not the one who did the <br /> original alterations. <br /> Glenn Santos directed the Health Agent to send a certified letter to the current owner of the <br /> property at 25 Cayuga Avenue, ordering hire to appear before the BOH for a Show cause <br /> Hearing at their next scheduled meeting of August 2, 2006. Failure to appear at the Show cause <br /> Hearing will result in the receipt of an. eviction notice by property owner. <br /> 3 <br />