Laserfiche WebLink
418@00—Doug Wffliams—42 Deer Ridge load—Title v violations <br /> Doug Williams was not present to address the natter of Title v violations and will be unavailable until <br /> January. <br /> 1 !Mike Borselli,Falmouth Engineering— 1 ,Squaw's Lane—Title V variance <br /> David Markoff of Falmouth Engineering discussed the revised plans that propose to relocate the septic <br /> tank to a better location but will require variances to allow the tank to be less than 10 feet from the <br /> property lire and less than 10 feet to a foundation wall, Mr. Harrington had no problem with the <br /> request. An effort was made to identify a more compliant location but due to the necessary elevation <br /> the tank would be above ground requiring additional filling and retaining. The proposed location is an <br /> improvement by 1 foot from the existing location. A waterproof membrane will be added to the home. <br /> Abutters have been notified, but no one was present at the meeting. <br /> Motion made by Nis.Egloff that the Board of Health approve the two Title V variances required <br /> to move the existing septic tank at 12 Squaw's lane. Motion seconded by Mr.Barton. All voted <br /> approval unanimously. <br /> NIEW BUSINESS <br /> 1. Sign Warrants: Members of the Board signed two warrants. <br /> . Approve Public Session Minutes: 7/8/09 and 7122109 <br /> Board members made corrections to the minutes of 718109. <br /> Motion made by Ms.Egloff to approve the minutes of July 8,2009 as amended. Motion <br /> seconded by Mr.Caplan. All voted approval unanimously. <br /> Board members made corrections to the minutes of 7/22109. <br /> Motion made by Ms. Egloff to approve the minutes of July 22, 2009 as amended. Motion <br /> seconded by Mr.Kaplan. All voted approval unanimously. <br /> 3. Review & Approval: Title v variances,93 Blurb Avenue <br /> Dan Johnson, representing the owner, indicated that he met witb Conservation and Mr. Harrington <br /> regarding potential environmental issues at the property. The done resource area requires that anything <br /> located within 75 feet must include UV disinfection. The proper is small and the leaching area <br /> accommodates the 4 bedrooms. Five variances have been requested for the septic design; 1 remove <br /> r and replace down to 2 feet instead of 5 feet, 2 reduce offset to groundwater from 2 feet to 5 feet, 3 <br /> reduce offset to leaching area from 10 feet to 5 feet, reduce offset from the proposed leaching field <br /> to the foundation from 20 feet to 25 feet and pwnp chamber is wi <br />