My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/11/2012 BOARD OF HEALTH Minutes
>
4/11/2012 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 5:08:23 PM
Creation date
3/28/2018 1:59:23 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
04/11/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
w <br /> •:'.+ ownMa-shpee <br /> ti <br /> C�f x r r <br /> VIP ? � .. <br /> 16 Great Neck Road North <br /> Mashpee, Massachusetts 02649 <br /> BOARD of HEALTH - PUBLIC SESSION <br /> Minutes of the Fleeting of April 11, 201 <br /> Board Members Present: Mem er'Absent: Also Present:. <br /> Lucy Burton, Chairman Burton Kaplan, Co-Chairman Glen Harrington, Health Agent <br /> Kalliope Eglff, Clerk <br /> Chairman Lucy Burton called the meeting to order at 7:05 PM. <br /> APPOINTMENTS <br /> 7:15 PM Thomas smith — Non-Compliance with Title V and Local BOH Regulations — <br /> 266 Ilnoosooy fat. <br /> Thomas Smith introduced himself to the Board. <br /> Glen Harrington stated that on November 15, 2001, the Board of Health approved the Title V design plan for. <br /> the new construction of a three bedroom dwelling at 266 Monomooy Road for Thomas smith. An <br /> Operations and Maintenance Contract was provided to the Board of Health for the purposes of obtaining <br /> occupancy on December 31,,2002. on September 30, 2010, Clivus New England, the company that sells <br /> and services the Clivus Multrum composting toilets notified the BOH that Nor. smith failed to maintain an <br /> M contract for the composting toilet. This property was built prior to the County maintaining the <br /> Carmody database so no notices were sent to the BOH for violations of lack of 0 & M contracts. since <br /> 2010, Mr. smith has been-to the office several times and was told on many occasions to obtain someone to <br /> perform the o & M. His response was always the same. Mr. Smith told Mr. Harrington that he takes care of <br /> it because it is easy-to maintain. <br /> Title V requires annual inspections due to the General Use Approval for composting toilets. No sampling is <br /> required for composting toilets, but there is a 30 -gallon liquid waste tank that needs to be pumped out <br /> occasionally. There is nothing on file stating that a licensed waste hauler has been servicing the system. <br /> The local BOH regulations require an annual inspection by a septic inspector with a report to be submitted <br /> to the Board of Health. No reports have been provided to date. Mr. Harrington spoke with Clivus New <br /> England, and the only service event performed was in 2004. <br /> Mr. Smith stated that he had Clivus New England do the maintenance on the system for a number of years, <br /> but because of the cost he took over the maintenance. Torn Smith commented that it is a simple system. It <br /> is sawdust in a pla§tic container that needs to be raked out, wet down, and then adds more sawdust. H <br /> adds worms and other treatments purchased from Clivus New England. Mr. smith took over the <br /> maintenance of the system for financial reasons. Mr. Smith stated that Clivus New England taught him the <br /> maintenance of the system not realizing-that th6 maintenance could only be performed by the company. Mr. <br /> Smith has the septic tank pumped every two years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.